A platform for research: civil engineering, architecture and urbanism
CONNECTION STRUCTURE AND CONNECTION METHOD
PROBLEM TO BE SOLVED: To provide a connection structure and a connection method that convey force to a main reinforcement for certain and enhance workability.SOLUTION: A connection structure S1 connects a first precast member 10A with a second precast member 10B. The first precast member 10A includes an edge surface 11a located at a top edge, a main reinforcement 12 embedded in the first precast member 10A, and a hole part 11b extending inside of the first precast member 10A from the edge surface 11a. The second precast member 10B includes an edge surface 11c located at a bottom edge, and a main reinforcement 12 protruded from the edge surface 11c and inserted into the hole part 11b. Mortar M is filled in the hole part 11b for embedding the main reinforcement 12. An anchoring body 13 is disposed at a tip of the main reinforcement 12. A U-shaped hook 12a is formed at a top edge of the main reinforcement 12 of the first precast member 10A, the U-shaped hook being bent in a direction away from the edge surface 11a.SELECTED DRAWING: Figure 6
【課題】本発明は、主筋への力の伝達を確実に行うと共に施工性を向上させることができる接合構造及び接合方法を提供する。【解決手段】接合構造S1では、第1プレキャスト部材10Aと第2プレキャスト部材10Bとを接合させる。第1プレキャスト部材10Aは、上端に位置する端面11aと、第1プレキャスト部材10Aに埋め込まれた主筋12と、端面11aから第1プレキャスト部材10Aの内側に延びる孔部11bとを備える。第2プレキャスト部材10Bは、下端に位置する端面11cと、端面11cから突出し孔部11bに挿入される主筋12とを備える。孔部11b内には、主筋12を埋め込むモルタルMが充填されている。主筋12の先端には定着体13が設けられている。第1プレキャスト部材10Aの主筋12の上端には、端面11aから離れる方向に折り返されたU字フック12aが設けられている。【選択図】図6
CONNECTION STRUCTURE AND CONNECTION METHOD
PROBLEM TO BE SOLVED: To provide a connection structure and a connection method that convey force to a main reinforcement for certain and enhance workability.SOLUTION: A connection structure S1 connects a first precast member 10A with a second precast member 10B. The first precast member 10A includes an edge surface 11a located at a top edge, a main reinforcement 12 embedded in the first precast member 10A, and a hole part 11b extending inside of the first precast member 10A from the edge surface 11a. The second precast member 10B includes an edge surface 11c located at a bottom edge, and a main reinforcement 12 protruded from the edge surface 11c and inserted into the hole part 11b. Mortar M is filled in the hole part 11b for embedding the main reinforcement 12. An anchoring body 13 is disposed at a tip of the main reinforcement 12. A U-shaped hook 12a is formed at a top edge of the main reinforcement 12 of the first precast member 10A, the U-shaped hook being bent in a direction away from the edge surface 11a.SELECTED DRAWING: Figure 6
【課題】本発明は、主筋への力の伝達を確実に行うと共に施工性を向上させることができる接合構造及び接合方法を提供する。【解決手段】接合構造S1では、第1プレキャスト部材10Aと第2プレキャスト部材10Bとを接合させる。第1プレキャスト部材10Aは、上端に位置する端面11aと、第1プレキャスト部材10Aに埋め込まれた主筋12と、端面11aから第1プレキャスト部材10Aの内側に延びる孔部11bとを備える。第2プレキャスト部材10Bは、下端に位置する端面11cと、端面11cから突出し孔部11bに挿入される主筋12とを備える。孔部11b内には、主筋12を埋め込むモルタルMが充填されている。主筋12の先端には定着体13が設けられている。第1プレキャスト部材10Aの主筋12の上端には、端面11aから離れる方向に折り返されたU字フック12aが設けられている。【選択図】図6
CONNECTION STRUCTURE AND CONNECTION METHOD
接合構造及び接合方法
OKUBO KAZUMASA (author) / FURUICHI KOSUKE (author) / YAMANOBE SHINICHI (author) / ICHINOMIYA TOSHIMICHI (author) / HONDA TOMOAKI (author) / YOKOTA YUKI (author) / MATSUURA MASANORI (author) / YOSHIHARA TOMOYOSHI (author)
2016-05-23
Patent
Electronic Resource
Japanese