A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To prevent the attachment of an asphalt mixture to a belt conveyer as much as possible and shorten the time required for cleaning the belt conveyer.SOLUTION: A belt loader 1 comprises a vehicle body part 3, a first belt conveyer 5 that is provided at the vehicle body part 3 and conveys an asphalt mixture, and a heater 7 that heats a belt 11 of the first belt conveyer 5 on the return side of the first belt conveyer 5.SELECTED DRAWING: Figure 1
【課題】ベルトコンベヤへのアスファルト合材の付着を極力防止し、ベルトコンベヤの清掃に要する時間を短縮する。【解決手段】車輌本体部3と、車輌本体部3に設けられアスファルト合材を搬送する第1のベルトコンベヤ5と、第1のベルトコンベヤ5のリターン側で第1のベルトコンベヤ5のベルト11を加熱するヒータ7とを有するベルトローダ1である。【選択図】図1
PROBLEM TO BE SOLVED: To prevent the attachment of an asphalt mixture to a belt conveyer as much as possible and shorten the time required for cleaning the belt conveyer.SOLUTION: A belt loader 1 comprises a vehicle body part 3, a first belt conveyer 5 that is provided at the vehicle body part 3 and conveys an asphalt mixture, and a heater 7 that heats a belt 11 of the first belt conveyer 5 on the return side of the first belt conveyer 5.SELECTED DRAWING: Figure 1
【課題】ベルトコンベヤへのアスファルト合材の付着を極力防止し、ベルトコンベヤの清掃に要する時間を短縮する。【解決手段】車輌本体部3と、車輌本体部3に設けられアスファルト合材を搬送する第1のベルトコンベヤ5と、第1のベルトコンベヤ5のリターン側で第1のベルトコンベヤ5のベルト11を加熱するヒータ7とを有するベルトローダ1である。【選択図】図1
BELT LOADER
ベルトローダ
KODA KAZUAKI (author)
2016-05-30
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Belt loader and big haulers handle million-yard cut
Engineering Index Backfile | 1965
City freeway haul made easy by belt-loader application
Engineering Index Backfile | 1965
|