A platform for research: civil engineering, architecture and urbanism
LONG-SANDBAG MANUFACTURING EQUIPMENT, MANUFACTURING METHOD AND LONG SANDBAG
PROBLEM TO BE SOLVED: To provide long-sandbag manufacturing equipment, which can efficiently manufacture long sandbags and can reduce the work loads for setting long sandbags and for carrying out completed products.SOLUTION: A long-sandbag manufacturing equipment 100 in this invention comprises: a filler hopper 102; support plates 110 which support long sandbags 200; a lifting mechanism 130 which lifts up and down the top end side of the support plates 110; a slide guide mechanism 140 which guides the lateral shift of the lower end sides of the support plates 110 during the lifting with the lifting mechanism 130. The upper end side of the support plates 110 is lowered to a designated level, then, long sandbags 200 are set on the support plates 110. After that, the upper end side of the support plates 110 is lifted up with the lifting mechanism 130, and filler is charged from the filler hopper 102. Upon completion of filling the filler, the upper end side of the support plates 110 is lowered to a designated level with the lifting mechanism 130, and the long sand bags 200A are carried out from the support plates 110.SELECTED DRAWING: Figure 1
【課題】 長尺土のうを効率良く製造することができ、かつ、長尺土のう袋のセット作業及び完成品の搬出作業の負担を軽減することができる長尺土のう製造装置を提供する。【解決手段】本発明に係る長尺土のう製造装置100は、充填材ホッパー102と、 長尺土のう袋200を支持する支持板110と、支持板110の上端側を昇降する昇降機構130と、昇降機構130による昇降の際に支持板110の下端側の横方向への移動を案内するスライドガイド機構140と、を備え、支持板110の上端側を所定に下降させた状態にて長尺土のう袋200を支持板110上にセットした後、昇降機構130により支持板110の上端側を上昇させて充填材ホッパー102から充填材を充填し、充填材の充填が完了した後、昇降機構130により支持板110の上端側を所定に下降させて長尺土のう200Aを支持板110から搬出する。【選択図】図1
LONG-SANDBAG MANUFACTURING EQUIPMENT, MANUFACTURING METHOD AND LONG SANDBAG
PROBLEM TO BE SOLVED: To provide long-sandbag manufacturing equipment, which can efficiently manufacture long sandbags and can reduce the work loads for setting long sandbags and for carrying out completed products.SOLUTION: A long-sandbag manufacturing equipment 100 in this invention comprises: a filler hopper 102; support plates 110 which support long sandbags 200; a lifting mechanism 130 which lifts up and down the top end side of the support plates 110; a slide guide mechanism 140 which guides the lateral shift of the lower end sides of the support plates 110 during the lifting with the lifting mechanism 130. The upper end side of the support plates 110 is lowered to a designated level, then, long sandbags 200 are set on the support plates 110. After that, the upper end side of the support plates 110 is lifted up with the lifting mechanism 130, and filler is charged from the filler hopper 102. Upon completion of filling the filler, the upper end side of the support plates 110 is lowered to a designated level with the lifting mechanism 130, and the long sand bags 200A are carried out from the support plates 110.SELECTED DRAWING: Figure 1
【課題】 長尺土のうを効率良く製造することができ、かつ、長尺土のう袋のセット作業及び完成品の搬出作業の負担を軽減することができる長尺土のう製造装置を提供する。【解決手段】本発明に係る長尺土のう製造装置100は、充填材ホッパー102と、 長尺土のう袋200を支持する支持板110と、支持板110の上端側を昇降する昇降機構130と、昇降機構130による昇降の際に支持板110の下端側の横方向への移動を案内するスライドガイド機構140と、を備え、支持板110の上端側を所定に下降させた状態にて長尺土のう袋200を支持板110上にセットした後、昇降機構130により支持板110の上端側を上昇させて充填材ホッパー102から充填材を充填し、充填材の充填が完了した後、昇降機構130により支持板110の上端側を所定に下降させて長尺土のう200Aを支持板110から搬出する。【選択図】図1
LONG-SANDBAG MANUFACTURING EQUIPMENT, MANUFACTURING METHOD AND LONG SANDBAG
長尺土のう製造装置、製造方法及び長尺土のう袋
TSUBAKI MASATOSHI (author) / TAKAKURA NOZOMI (author)
2016-07-11
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
SANDBAG MANUFACTURING DEVICE AND SANDBAG MANUFACTURING METHOD
European Patent Office | 2022
|SANDBAG ASSEMBLY UNIT, SANDBAG STRUCTURE, AND SANDBAG CONNECTION DEVICE
European Patent Office | 2023
|SANDBAG BAG, SANDBAG, AND INSTALLATION METHOD FOR SANDBAG
European Patent Office | 2015
|