FLOOD PREVENTION STRUCTURE
PROBLEM TO BE SOLVED: To provide a flood prevention structure capable of reducing time and effort to install the structure.SOLUTION: A flood prevention structure prevents water from entering from a clearance gap between a guide rail 14 of a jamb installed on a wall of a building and an outside surface of a shutter curtain 30 of a shutter 1. The flood prevention structure includes: a waterproof sheet 40, which is provided to reach the guide rail 14 from the outside surface of the sutter curtain 30 in a state where an opening 3 is fully closed by the shutter curtain 30; and a lateral insertion member 50 to be inserted into the clearance gap. At least a lateral cross-sectional shape of a lateral insertion end 52 of the lateral insertion member 50 is a wedge shape. The lateral insertion end 52 and a part of the waterproof sheet 40 are inserted into the clearance gap so that the waterproof sheet 40 is held between the guide rail 14 and the lateral insertion end 52 in a state where the opening 3 is fully closed.SELECTED DRAWING: Figure 2
【課題】設置の手間を低減することが可能になる、浸水防止構造を提供すること。【解決手段】浸水防止構造は、建物の壁に設けられた縦枠のガイドレール14と、シャッター1のシャッターカーテン30の外側面との相互間の隙間から水が浸入することを防止するための浸水防止構造であって、シャッターカーテン30によって開口部3を全閉した状態において、シャッターカーテン30の外側面からガイドレール14に至るように設けられた防水シート40と、上記隙間に差し込むための側方差込部材50とを備え、側方差込部材50のうち少なくとも側方差込端部52の横断面形状をくさび状とし、上記開口部3を全閉した状態において、防水シート40が、ガイドレール14と側方差込端部52とによって挟持されるように、側方差込端部52及び防水シート40の一部を上記隙間に差し込んだ。【選択図】図2
FLOOD PREVENTION STRUCTURE
PROBLEM TO BE SOLVED: To provide a flood prevention structure capable of reducing time and effort to install the structure.SOLUTION: A flood prevention structure prevents water from entering from a clearance gap between a guide rail 14 of a jamb installed on a wall of a building and an outside surface of a shutter curtain 30 of a shutter 1. The flood prevention structure includes: a waterproof sheet 40, which is provided to reach the guide rail 14 from the outside surface of the sutter curtain 30 in a state where an opening 3 is fully closed by the shutter curtain 30; and a lateral insertion member 50 to be inserted into the clearance gap. At least a lateral cross-sectional shape of a lateral insertion end 52 of the lateral insertion member 50 is a wedge shape. The lateral insertion end 52 and a part of the waterproof sheet 40 are inserted into the clearance gap so that the waterproof sheet 40 is held between the guide rail 14 and the lateral insertion end 52 in a state where the opening 3 is fully closed.SELECTED DRAWING: Figure 2
【課題】設置の手間を低減することが可能になる、浸水防止構造を提供すること。【解決手段】浸水防止構造は、建物の壁に設けられた縦枠のガイドレール14と、シャッター1のシャッターカーテン30の外側面との相互間の隙間から水が浸入することを防止するための浸水防止構造であって、シャッターカーテン30によって開口部3を全閉した状態において、シャッターカーテン30の外側面からガイドレール14に至るように設けられた防水シート40と、上記隙間に差し込むための側方差込部材50とを備え、側方差込部材50のうち少なくとも側方差込端部52の横断面形状をくさび状とし、上記開口部3を全閉した状態において、防水シート40が、ガイドレール14と側方差込端部52とによって挟持されるように、側方差込端部52及び防水シート40の一部を上記隙間に差し込んだ。【選択図】図2
FLOOD PREVENTION STRUCTURE
浸水防止構造
MUKAI CHIAKI (author) / IZAWA HIDEMI (author)
2016-07-11
Patent
Electronic Resource
Japanese
IPC:
E06B
Feste oder bewegliche Abschlüsse für Öffnungen in Bauwerken, Fahrzeugen, Zäunen oder ähnlichen Einfriedungen allgemein, z.B. Türen, Fenster, Läden, Tore
,
FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES, OR LIKE ENCLOSURES, IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES