A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR CONCRETE FOUNDATION PILE
PROBLEM TO BE SOLVED: To manufacture and provide a concrete foundation pile fit for a depth at a construction site that differs from a depth of an excavated bearing layer confirmed beforehand, when installing a precast concrete pile in the bearing layer of a ground of a projection surface of a building to be constructed.SOLUTION: When a depth of the bearing layer of the ground of the projection surface of the building to be constructed differs from a depth confirmed beforehand, a unit pile for length adjustment is selected and connected to a lower part of a precast concrete pile manufactured according to the depth confirmed beforehand or a precast concrete pile prepared beforehand, for forming a foundation pile that serves as a foundation of a necessary structure, and the concrete foundation pile is constructed.SELECTED DRAWING: Figure 2
【課題】本発明は構築しようとする建物投影面の地盤の支持層に既製コンクリート杭を実施する段階において、掘削した支持層の深さが事前に確認した深さと異なる場合に、施工現場において異なる深さに対応したコンクリート製基礎杭を製造し提供する。【解決手段】構築しようとする建物投影面の地盤の支持層の深さが事前に確認した深さと異なる場合、事前に確認した深さに基づいて製造した既製コンクリート杭や事前に用意した既製コンクリート杭の下部に長さ調整用単位杭を選択して接続し、必要な構造物の基礎とする基礎用杭を作成し、該コンクリート製基礎杭を施工する。【選択図】 図2
CONSTRUCTION METHOD FOR CONCRETE FOUNDATION PILE
PROBLEM TO BE SOLVED: To manufacture and provide a concrete foundation pile fit for a depth at a construction site that differs from a depth of an excavated bearing layer confirmed beforehand, when installing a precast concrete pile in the bearing layer of a ground of a projection surface of a building to be constructed.SOLUTION: When a depth of the bearing layer of the ground of the projection surface of the building to be constructed differs from a depth confirmed beforehand, a unit pile for length adjustment is selected and connected to a lower part of a precast concrete pile manufactured according to the depth confirmed beforehand or a precast concrete pile prepared beforehand, for forming a foundation pile that serves as a foundation of a necessary structure, and the concrete foundation pile is constructed.SELECTED DRAWING: Figure 2
【課題】本発明は構築しようとする建物投影面の地盤の支持層に既製コンクリート杭を実施する段階において、掘削した支持層の深さが事前に確認した深さと異なる場合に、施工現場において異なる深さに対応したコンクリート製基礎杭を製造し提供する。【解決手段】構築しようとする建物投影面の地盤の支持層の深さが事前に確認した深さと異なる場合、事前に確認した深さに基づいて製造した既製コンクリート杭や事前に用意した既製コンクリート杭の下部に長さ調整用単位杭を選択して接続し、必要な構造物の基礎とする基礎用杭を作成し、該コンクリート製基礎杭を施工する。【選択図】 図2
CONSTRUCTION METHOD FOR CONCRETE FOUNDATION PILE
コンクリート製基礎杭の施工方法
BETSUKI SHIGERU (author)
2016-07-25
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2015
|Reinforced concrete anti-seismic bridge pile foundation and pile foundation construction method
European Patent Office | 2021
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2020
|