CONSTRUCTION METHOD OF SEISMICALLY ISOLATED BUILDING
PROBLEM TO BE SOLVED: To appropriately support in a seismically isolated manner, a structure in which a first structure upon completion of a first construction work for constructing the first structure and a second structure upon completion of second construction work for constructing the second structure are integrated, regarding a seismically isolated building constructed through the first construction work and the second construction work.SOLUTION: The construction method of a seismically isolated building is provided that comprises the steps of : arranging a plurality of first seismic isolators on a first foundation part thereby constructing a first seismic isolation layer; constructing a first structure supported by the first seismic isolation layer; arranging the first seismic isolator taken out selectively from the first seismic isolation layer and a plurality of second seismic isolators on a second foundation part thereby constructing a second seismic isolation layer; arranging a third seismic isolator at a location on the first foundation part where the first seismic isolator has been taken out from the first seismic isolation layer; and constructing a second structure supported on the second seismic isolation layer integrally with the first structure.SELECTED DRAWING: Figure 1
【課題】第1構造物を構築する第1工事と第2構造物を構築する第2工事とを経て構築される免震建物において、第1工事完了時の第1構造物、及び第2工事完了時の第1構造物と第2構造物が一体となった構造物を適切に免震支持する。【解決手段】第1免震装置を第1基礎部上に複数配置して第1免震層を構築する工程と、前記第1免震層に支持される第1構造物を構築する工程と、前記第1免震層から選択的に取り出した前記第1免震装置と複数の第2免震装置を第2基礎部上に配置して第2免震層を構築する工程と、前記第1免震層から前記第1免震装置を取り出した前記第1基礎部上の位置に第3免震装置を配置する工程と、前記第2免震層に支持される第2構造物を前記第1構造物と一体に構築する工程と、を有する免震建物の施工方法。【選択図】図1
CONSTRUCTION METHOD OF SEISMICALLY ISOLATED BUILDING
PROBLEM TO BE SOLVED: To appropriately support in a seismically isolated manner, a structure in which a first structure upon completion of a first construction work for constructing the first structure and a second structure upon completion of second construction work for constructing the second structure are integrated, regarding a seismically isolated building constructed through the first construction work and the second construction work.SOLUTION: The construction method of a seismically isolated building is provided that comprises the steps of : arranging a plurality of first seismic isolators on a first foundation part thereby constructing a first seismic isolation layer; constructing a first structure supported by the first seismic isolation layer; arranging the first seismic isolator taken out selectively from the first seismic isolation layer and a plurality of second seismic isolators on a second foundation part thereby constructing a second seismic isolation layer; arranging a third seismic isolator at a location on the first foundation part where the first seismic isolator has been taken out from the first seismic isolation layer; and constructing a second structure supported on the second seismic isolation layer integrally with the first structure.SELECTED DRAWING: Figure 1
【課題】第1構造物を構築する第1工事と第2構造物を構築する第2工事とを経て構築される免震建物において、第1工事完了時の第1構造物、及び第2工事完了時の第1構造物と第2構造物が一体となった構造物を適切に免震支持する。【解決手段】第1免震装置を第1基礎部上に複数配置して第1免震層を構築する工程と、前記第1免震層に支持される第1構造物を構築する工程と、前記第1免震層から選択的に取り出した前記第1免震装置と複数の第2免震装置を第2基礎部上に配置して第2免震層を構築する工程と、前記第1免震層から前記第1免震装置を取り出した前記第1基礎部上の位置に第3免震装置を配置する工程と、前記第2免震層に支持される第2構造物を前記第1構造物と一体に構築する工程と、を有する免震建物の施工方法。【選択図】図1
CONSTRUCTION METHOD OF SEISMICALLY ISOLATED BUILDING
免震建物の施工方法
IKEUCHI KUNIE (author) / SERIZAWA YOSHINORI (author) / OKADA MITSUHIRO (author) / SUZUKI NAOMIKI (author)
2016-07-25
Patent
Electronic Resource
Japanese
COLLISION SHOCK ABSORBING MEMBER FOR SEISMICALLY ISOLATED BUILDING AND SEISMICALLY ISOLATED BUILDING
European Patent Office | 2022
|Shear building representations of seismically isolated buildings
British Library Online Contents | 2011
|