A platform for research: civil engineering, architecture and urbanism
TEMPORARY SCAFFOLD
PROBLEM TO BE SOLVED: To fasten a clamp of a wall tie member to an upper beam material of a beam frame body of a temporary scaffold while suppressing the exertion of an adverse effect to the temporary scaffold.SOLUTION: In a temporary scaffold 1 which comprises columnar supports 2, a beam frame body 3 arranged between the columnar supports 2, a scaffold plate 6 supported by the beam frame body 3, and a wall tie member 100 for tying the temporary scaffold 1 to a building, the beam frame body 3 has an upper beam material 42 for holding the scaffold plate 6 at an upper part, a lower beam material 43 located below the upper beam material 42, and a bridge member 44 for connecting both the beam materials. Then, a clamp 103 of the wall tie member 100 is fastened to the upper beam material 42 in a state of intruding into a clearance between the scaffold plate 6 and the upper beam material 42. Ends of the upper beam material 42 and the lower beam material 43 in the extension direction are connected to the columnar supports 2.SELECTED DRAWING: Figure 6
【課題】仮設足場に悪影響が及ぶのを抑えつつ、仮設足場の梁枠体の上梁材に壁繋ぎ部材のクランプを締結する。【解決手段】支柱2と、支柱2の間に配置された梁枠体3と、梁枠体3によって支えられる足場板6と、仮設足場1を建物に繋ぐための壁繋ぎ部材100と、を備えた仮設足場1において、梁枠体3は、上部にて足場板6を保持する上梁材42と、上梁材42の下方に位置する下梁材43と、両梁材を連結する架橋部材44とを有する。また、壁繋ぎ部材100のクランプ103は、足場板6と上梁材42との間に入り込んだ状態で上梁材42に締結されている。上梁材42及び下梁材43のそれぞれの延出方向端部は、支柱2に連結されている。【選択図】図6
TEMPORARY SCAFFOLD
PROBLEM TO BE SOLVED: To fasten a clamp of a wall tie member to an upper beam material of a beam frame body of a temporary scaffold while suppressing the exertion of an adverse effect to the temporary scaffold.SOLUTION: In a temporary scaffold 1 which comprises columnar supports 2, a beam frame body 3 arranged between the columnar supports 2, a scaffold plate 6 supported by the beam frame body 3, and a wall tie member 100 for tying the temporary scaffold 1 to a building, the beam frame body 3 has an upper beam material 42 for holding the scaffold plate 6 at an upper part, a lower beam material 43 located below the upper beam material 42, and a bridge member 44 for connecting both the beam materials. Then, a clamp 103 of the wall tie member 100 is fastened to the upper beam material 42 in a state of intruding into a clearance between the scaffold plate 6 and the upper beam material 42. Ends of the upper beam material 42 and the lower beam material 43 in the extension direction are connected to the columnar supports 2.SELECTED DRAWING: Figure 6
【課題】仮設足場に悪影響が及ぶのを抑えつつ、仮設足場の梁枠体の上梁材に壁繋ぎ部材のクランプを締結する。【解決手段】支柱2と、支柱2の間に配置された梁枠体3と、梁枠体3によって支えられる足場板6と、仮設足場1を建物に繋ぐための壁繋ぎ部材100と、を備えた仮設足場1において、梁枠体3は、上部にて足場板6を保持する上梁材42と、上梁材42の下方に位置する下梁材43と、両梁材を連結する架橋部材44とを有する。また、壁繋ぎ部材100のクランプ103は、足場板6と上梁材42との間に入り込んだ状態で上梁材42に締結されている。上梁材42及び下梁材43のそれぞれの延出方向端部は、支柱2に連結されている。【選択図】図6
TEMPORARY SCAFFOLD
仮設足場
HAYASHI TEPPEI (author) / TANAKA SHUSUI (author)
2016-09-05
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste