A platform for research: civil engineering, architecture and urbanism
VERTICAL SHAFT, UNDERGROUND STORAGE TANK, CONSTRUCTION METHOD FOR VERTICAL SHAFT, AND CONSTRUCTION METHOD FOR UNDERGROUND STORAGE TANK
PROBLEM TO BE SOLVED: To provide a vertical shaft capable of being simply constructed even when a banking part is provided on an upper outer periphery, an underground storage tank, a construction method for the vertical shaft, and a construction method for the underground storage tank.SOLUTION: A vertical shaft 5 includes: a continuous underground wall 6 that is formed in a cylindrical shape; a segment ring 7 that is erected at an upper end of the continuous underground wall 6; and a banking part 8 that is formed by heaping up excavated surplus soil, produced by excavating ground surrounded by the continuous underground wall 6, on the outer periphery of the segment ring 7. An underground storage tank 1 has a base 2 and a side wall 3 formed within the vertical shaft 5.SELECTED DRAWING: Figure 1
【課題】上部外周囲に盛土部を有する場合であっても、簡易に構築することが可能な立坑、地下式貯槽、立坑の構築方法および地下式貯槽の構築方法を提案する。【解決手段】円筒状に形成した地中連続壁6と、地中連続壁6の上端に立設されたセグメントリング7と、地中連続壁6により囲まれた地盤を掘削することにより発生した掘削残土をセグメントリング7の外周囲に盛り立てることにより形成された盛土部8とを備える立坑5と、この立坑1内に底版2および側壁3が形成された地下式貯槽1。【選択図】図1
VERTICAL SHAFT, UNDERGROUND STORAGE TANK, CONSTRUCTION METHOD FOR VERTICAL SHAFT, AND CONSTRUCTION METHOD FOR UNDERGROUND STORAGE TANK
PROBLEM TO BE SOLVED: To provide a vertical shaft capable of being simply constructed even when a banking part is provided on an upper outer periphery, an underground storage tank, a construction method for the vertical shaft, and a construction method for the underground storage tank.SOLUTION: A vertical shaft 5 includes: a continuous underground wall 6 that is formed in a cylindrical shape; a segment ring 7 that is erected at an upper end of the continuous underground wall 6; and a banking part 8 that is formed by heaping up excavated surplus soil, produced by excavating ground surrounded by the continuous underground wall 6, on the outer periphery of the segment ring 7. An underground storage tank 1 has a base 2 and a side wall 3 formed within the vertical shaft 5.SELECTED DRAWING: Figure 1
【課題】上部外周囲に盛土部を有する場合であっても、簡易に構築することが可能な立坑、地下式貯槽、立坑の構築方法および地下式貯槽の構築方法を提案する。【解決手段】円筒状に形成した地中連続壁6と、地中連続壁6の上端に立設されたセグメントリング7と、地中連続壁6により囲まれた地盤を掘削することにより発生した掘削残土をセグメントリング7の外周囲に盛り立てることにより形成された盛土部8とを備える立坑5と、この立坑1内に底版2および側壁3が形成された地下式貯槽1。【選択図】図1
VERTICAL SHAFT, UNDERGROUND STORAGE TANK, CONSTRUCTION METHOD FOR VERTICAL SHAFT, AND CONSTRUCTION METHOD FOR UNDERGROUND STORAGE TANK
立坑、地下式貯槽、立坑の構築方法および地下式貯槽の構築方法
KOBAYASHI YUKI (author) / YAMAMOTO TAIRA (author) / SUZUKI RYOSUKE (author) / KIMURA TOSHIHIDE (author)
2016-09-23
Patent
Electronic Resource
Japanese
VERTICAL SHAFT CONSTRUCTION METHOD AND UNDERGROUND STORAGE TANK CONSTRUCTION METHOD
European Patent Office | 2016
|Construction method for underground vertical shaft structures
European Patent Office | 2018
|Pouring construction method for underground diaphragm wall of vertical shaft
European Patent Office | 2024
|UNDERGROUND TANK AND CONSTRUCTION METHOD OF UNDERGROUND TANK
European Patent Office | 2019
|UNDERGROUND TANK AND CONSTRUCTION METHOD OF UNDERGROUND TANK
European Patent Office | 2019
|