PILE FOUNDATION STRUCTURE
PROBLEM TO BE SOLVED: To provide a pile foundation structure that suppresses increase in construction costs and elongation of a construction period.SOLUTION: A pile foundation structure 1 is for supporting a building, and includes a below-column pile 10 having a column erected on a top of the pile, a non-below-column pile 20 without a column erected on a top of the pile, and a foundation beam 30 connecting the below-column pile 10 and the non-below-column pile 20. The non-below-column pile 20 is arranged between the below-column piles 10, 10, and a pile bottom end of the non-below-column pile 20 is supported on a bearing layer 4. Desirably, a foundation footing 31 should be formed on the foundation beam 30 above the non-below-column pile 20, and the non-below-column pile 20, the foundation footing 31, and the foundation beam 30 should be connected.SELECTED DRAWING: Figure 1
【課題】施工費用の高額化と施工期間の長期化を抑制できる杭基礎構造を提供する。【解決手段】構造物を支持する杭基礎構造1であって、杭上部に柱が設けられた柱下杭10と、杭上部に柱が設けられていない非柱下杭20と、柱下杭10および非柱下杭20を連結する基礎梁30と、を備え、非柱下杭20は柱下杭10,10同士の間に配置されており、かつ非柱下杭20の杭下端部は支持層4に支持されていることを特徴とする。非柱下杭20上の基礎梁30には基礎フーチング31が形成されており、非柱下杭20と基礎フーチング31と基礎梁30が連結されているものが好ましい。【選択図】図1
PILE FOUNDATION STRUCTURE
PROBLEM TO BE SOLVED: To provide a pile foundation structure that suppresses increase in construction costs and elongation of a construction period.SOLUTION: A pile foundation structure 1 is for supporting a building, and includes a below-column pile 10 having a column erected on a top of the pile, a non-below-column pile 20 without a column erected on a top of the pile, and a foundation beam 30 connecting the below-column pile 10 and the non-below-column pile 20. The non-below-column pile 20 is arranged between the below-column piles 10, 10, and a pile bottom end of the non-below-column pile 20 is supported on a bearing layer 4. Desirably, a foundation footing 31 should be formed on the foundation beam 30 above the non-below-column pile 20, and the non-below-column pile 20, the foundation footing 31, and the foundation beam 30 should be connected.SELECTED DRAWING: Figure 1
【課題】施工費用の高額化と施工期間の長期化を抑制できる杭基礎構造を提供する。【解決手段】構造物を支持する杭基礎構造1であって、杭上部に柱が設けられた柱下杭10と、杭上部に柱が設けられていない非柱下杭20と、柱下杭10および非柱下杭20を連結する基礎梁30と、を備え、非柱下杭20は柱下杭10,10同士の間に配置されており、かつ非柱下杭20の杭下端部は支持層4に支持されていることを特徴とする。非柱下杭20上の基礎梁30には基礎フーチング31が形成されており、非柱下杭20と基礎フーチング31と基礎梁30が連結されているものが好ましい。【選択図】図1
PILE FOUNDATION STRUCTURE
杭基礎構造
NAGAO TOSHIMASA (author) / HORII YOSHIHIRO (author) / ARIYAMA NOBUYUKI (author)
2016-12-01
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE FOUNDATION REPAIR METHOD, PILE FOUNDATION REPAIR KIT, AND PILE FOUNDATION STRUCTURE