A platform for research: civil engineering, architecture and urbanism
INSTALLATION STRUCTURE OF POST-CONSTRUCTION ANCHOR
PROBLEM TO BE SOLVED: To provide an installation structure of a post-construction anchor capable of executing construction by further easily and surely positioning and holding an anchor member.SOLUTION: An installation structure of a post-construction anchor comprises a substantially cylindrical sleeve 2 integrally provided in a previously constructed concrete member 1, an anchor member 3 arranged by being inserted into the sleeve 2, a filler 4 filled in the sleeve 2 and fixing the anchor member 3 and a holding mechanism B for positioning and holding the anchor member 3 inserted into the sleeve 2 in the sleeve 2. The holding mechanism B comprises an elastic holding body 6 for forming an anchor insertion part having a predetermined width dimension in the radial direction with the axis O1 of the sleeve 2 as the center, inserting the anchor member 3 into the anchor insertion part and elastically deformably formed on the outside in the radial direction of the width direction.SELECTED DRAWING: Figure 1
【課題】より容易に且つ確実にアンカー部材を位置決め保持して施工を行うことを可能にするあと施工アンカーの取付構造を提供する。【解決手段】先に施工されたコンクリート部材1に一体に設けられた略筒状のスリーブ2と、スリーブ2内に差し込んで配設されるアンカー部材3と、スリーブ2内に充填され、アンカー部材3を定着させるための充填剤4と、スリーブ2内に差し込んだアンカー部材3をスリーブ2内で位置決め保持するための保持機構Bとを備える。そして、保持機構Bを、スリーブ2の軸線O1を中心とし径方向に所定の幅寸法を有するアンカー挿通部を形成し、且つアンカー部材3をアンカー挿通部に挿通するとともに幅方向の径方向外側に弾性変形可能に形成された弾性保持体6を備えて構成する。【選択図】図1
INSTALLATION STRUCTURE OF POST-CONSTRUCTION ANCHOR
PROBLEM TO BE SOLVED: To provide an installation structure of a post-construction anchor capable of executing construction by further easily and surely positioning and holding an anchor member.SOLUTION: An installation structure of a post-construction anchor comprises a substantially cylindrical sleeve 2 integrally provided in a previously constructed concrete member 1, an anchor member 3 arranged by being inserted into the sleeve 2, a filler 4 filled in the sleeve 2 and fixing the anchor member 3 and a holding mechanism B for positioning and holding the anchor member 3 inserted into the sleeve 2 in the sleeve 2. The holding mechanism B comprises an elastic holding body 6 for forming an anchor insertion part having a predetermined width dimension in the radial direction with the axis O1 of the sleeve 2 as the center, inserting the anchor member 3 into the anchor insertion part and elastically deformably formed on the outside in the radial direction of the width direction.SELECTED DRAWING: Figure 1
【課題】より容易に且つ確実にアンカー部材を位置決め保持して施工を行うことを可能にするあと施工アンカーの取付構造を提供する。【解決手段】先に施工されたコンクリート部材1に一体に設けられた略筒状のスリーブ2と、スリーブ2内に差し込んで配設されるアンカー部材3と、スリーブ2内に充填され、アンカー部材3を定着させるための充填剤4と、スリーブ2内に差し込んだアンカー部材3をスリーブ2内で位置決め保持するための保持機構Bとを備える。そして、保持機構Bを、スリーブ2の軸線O1を中心とし径方向に所定の幅寸法を有するアンカー挿通部を形成し、且つアンカー部材3をアンカー挿通部に挿通するとともに幅方向の径方向外側に弾性変形可能に形成された弾性保持体6を備えて構成する。【選択図】図1
INSTALLATION STRUCTURE OF POST-CONSTRUCTION ANCHOR
あと施工アンカーの取付構造
NAGASHIMA KIYOSHI (author) / TOZAWA MASAMI (author) / OKA JUN (author) / EGUCHI AKIHIKO (author)
2016-12-08
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
POST-CONSTRUCTION ANCHOR AND INSTALLATION METHOD OF INSTALLATION OBJECT
European Patent Office | 2017
|POST-INSTALLED ANCHOR AND INSTALLATION STRUCTURE THEREOF
European Patent Office | 2020
|POST-INSTALLED ANCHOR AND INSTALLATION STRUCTURE THEREOF
European Patent Office | 2020
|European Patent Office | 2016
|DRILL BIT AND INSTALLATION METHOD OF POST-CONSTRUCTION ANCHOR
European Patent Office | 2020
|