A platform for research: civil engineering, architecture and urbanism
STEEL PLATE CONCRETE STRUCTURE
PROBLEM TO BE SOLVED: To provide a shear-reinforced steel plate concrete structure of high workability efficiency, while securing rigidity in construction.SOLUTION: A steel plate concrete structure 10 comprises a pair of oppositely arranged steel plates 1 and 1, a concrete part 6 filled between the pair of steel plates 1 and 1, a stud 2 projecting toward the concrete part 6 from the respective steel plates 1 and providing a female screw in a tip part 2T, a first tie bar 4A threadedly engaged with the stud 2 provided on one steel plate 1, a second tie bar 4B threadedly engaged with the stud 2 provided on the other steel plate 1 and a connector 5 for connecting the first tie bar 4A and the second tie bar 4B and capable of adjusting tensile force of the first tie bar 4A and tensile force of the second tie bar 4B.SELECTED DRAWING: Figure 1
【課題】施工時の剛性を確保しつつ、作業性効率の高いせん断補強された鋼板コンクリート構造を提供する。【解決手段】鋼板コンクリート構造10は、対向配置された一対の鋼板1,1と、一対の鋼板1,1の間に充填されたコンクリート部6と、各鋼板1からコンクリート部6に向かって突出し、先端部2Tに雌ネジが設けられたスタッド2と、一の鋼板1に設けられたスタッド2に螺合された第一タイバー4A及び他の鋼板1に設けられたスタッド2に螺合された第二タイバー4Bと、第一タイバー4Aと第二タイバー4Bとを連結し、かつ第一タイバー4Aの引張力及び第二タイバー4Bの引張力を調整可能な連結具5と、を備えることを特徴とする。【選択図】図1
STEEL PLATE CONCRETE STRUCTURE
PROBLEM TO BE SOLVED: To provide a shear-reinforced steel plate concrete structure of high workability efficiency, while securing rigidity in construction.SOLUTION: A steel plate concrete structure 10 comprises a pair of oppositely arranged steel plates 1 and 1, a concrete part 6 filled between the pair of steel plates 1 and 1, a stud 2 projecting toward the concrete part 6 from the respective steel plates 1 and providing a female screw in a tip part 2T, a first tie bar 4A threadedly engaged with the stud 2 provided on one steel plate 1, a second tie bar 4B threadedly engaged with the stud 2 provided on the other steel plate 1 and a connector 5 for connecting the first tie bar 4A and the second tie bar 4B and capable of adjusting tensile force of the first tie bar 4A and tensile force of the second tie bar 4B.SELECTED DRAWING: Figure 1
【課題】施工時の剛性を確保しつつ、作業性効率の高いせん断補強された鋼板コンクリート構造を提供する。【解決手段】鋼板コンクリート構造10は、対向配置された一対の鋼板1,1と、一対の鋼板1,1の間に充填されたコンクリート部6と、各鋼板1からコンクリート部6に向かって突出し、先端部2Tに雌ネジが設けられたスタッド2と、一の鋼板1に設けられたスタッド2に螺合された第一タイバー4A及び他の鋼板1に設けられたスタッド2に螺合された第二タイバー4Bと、第一タイバー4Aと第二タイバー4Bとを連結し、かつ第一タイバー4Aの引張力及び第二タイバー4Bの引張力を調整可能な連結具5と、を備えることを特徴とする。【選択図】図1
STEEL PLATE CONCRETE STRUCTURE
鋼板コンクリート構造
HIRAMA TOSHIHIKO (author) / OTA KAZUYA (author)
2016-12-22
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
STEEL PLATE CONCRETE STRUCTURE AND CONSTRUCTION METHOD FOR STEEL PLATE CONCRETE STRUCTURE
European Patent Office | 2018
|