A platform for research: civil engineering, architecture and urbanism
NON-EXCAVATION DRAIN PIPE BURYING METHOD
PROBLEM TO BE SOLVED: To provide a non-excavation drain pipe burying method that may be executed readily in an urban area or a road with a heavy traffic at a low cost, at the same time facilitating maintenance and management.SOLUTION: A starting shaft 1 and an arrival shaft 2 are excavated from a ground surface, leaving a distance therebetween. An adit 3 is excavated from the starting shaft 1 toward the arrival shaft 2, at the same time advancing a sleeve pipe 10. The sleeve pipe 10 is made to penetrate through the adit 3, and installed inside the adit 3. A water-permeable drain pipe 4 is inserted and placed inside the sleeve pipe 10. Then, the sleeve pipe 10 is pulled out from the adit 3, leaving behind the drain pipe 4 inside the adit 3.SELECTED DRAWING: Figure 9
【課題】市街地や交通量の多い道路でも容易に施工でき、コストが低廉で済み、維持管理も容易な非開削ドレイン管埋設工法を提供する。【解決手段】地面から発進立坑1及び到達立坑2を互いに距離をおいて掘削する。発進立坑1から到達立坑2に向かって横坑3を掘削すると同時に鞘管10を推進させ、横抗3を貫通させると共に横抗3内に鞘管10を設置する。鞘管10内に透水性のドレイン管4を挿入配置する。そして、横抗3から鞘管10を引き抜いて、横抗3内にドレイン管4を残置する。【選択図】図9
NON-EXCAVATION DRAIN PIPE BURYING METHOD
PROBLEM TO BE SOLVED: To provide a non-excavation drain pipe burying method that may be executed readily in an urban area or a road with a heavy traffic at a low cost, at the same time facilitating maintenance and management.SOLUTION: A starting shaft 1 and an arrival shaft 2 are excavated from a ground surface, leaving a distance therebetween. An adit 3 is excavated from the starting shaft 1 toward the arrival shaft 2, at the same time advancing a sleeve pipe 10. The sleeve pipe 10 is made to penetrate through the adit 3, and installed inside the adit 3. A water-permeable drain pipe 4 is inserted and placed inside the sleeve pipe 10. Then, the sleeve pipe 10 is pulled out from the adit 3, leaving behind the drain pipe 4 inside the adit 3.SELECTED DRAWING: Figure 9
【課題】市街地や交通量の多い道路でも容易に施工でき、コストが低廉で済み、維持管理も容易な非開削ドレイン管埋設工法を提供する。【解決手段】地面から発進立坑1及び到達立坑2を互いに距離をおいて掘削する。発進立坑1から到達立坑2に向かって横坑3を掘削すると同時に鞘管10を推進させ、横抗3を貫通させると共に横抗3内に鞘管10を設置する。鞘管10内に透水性のドレイン管4を挿入配置する。そして、横抗3から鞘管10を引き抜いて、横抗3内にドレイン管4を残置する。【選択図】図9
NON-EXCAVATION DRAIN PIPE BURYING METHOD
非開削ドレイン管埋設工法
SHIMIZU TOSHITAKA (author) / MORIGUCHI TAKESHI (author)
2017-01-05
Patent
Electronic Resource
Japanese
Man-machine opposite-roof non-excavation pipe burying construction method
European Patent Office | 2022
|Th method of of burying the protection steel pipe horizontally without excavation
European Patent Office | 2025
Th method of of burying the protection steel pipe horizontally without excavation
European Patent Office | 2023
|Th method of of burying the protection steel pipe horizontally without excavation
European Patent Office | 2025
|DRAINAGE PIPE BURYING DEVICE AND DRAINAGE PIPE BURYING METHOD
European Patent Office | 2021
|