A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF JOINT STRUCTURE AND JOINT STRUCTURE
PROBLEM TO BE SOLVED: To provide a construction method of a joint structure and the joint structure, capable of easily removing a member used for constructing the joint structure.SOLUTION: A construction method of a joint structure 1A comprises a first placing process of placing first concrete 3a and a joint member installation process of providing a joint member 4 for contacting in a surface with a part of a header surface 13a of the first concrete 3a and a second placing process of placing second concrete 3b so that a part of a header surface 13b contacts in a surface with the joint member 4. The joint member 4 includes a first plate member 6a for contacting in a surface with the header surface 13a of the first concrete 3a, a second plate member 6b separately opposed to the first plate member 6a and contacting in a surface with the header surface 13b of the second concrete 3b and a space holding material 7 interposed in a clearance between the first plate member 6a and the second plate member 6b.SELECTED DRAWING: Figure 1
【課題】目地構造の構築のために用いた部材を容易に除去することができる目地構造の構築方法、及び、目地構造を提供する。【解決手段】目地構造1Aの構築方法として、第1のコンクリート3aを打設する第1の打設工程と、第1のコンクリート3aの小口面13aの一部に面接触する目地用部材4を設ける目地用部材設置工程と、目地用部材4に小口面13bの一部が面接触するように第2のコンクリート3bを打設する第2の打設工程と、を有する。目地用部材4は、第1のコンクリート3aの小口面13aに面接触する第1の板部材6aと、第1の板部材6aに対し離間して対向するとともに第2のコンクリート3bの小口面13bに面接触する第2の板部材6bと、第1の板部材6aと第2の板部材6bとの隙間に介在する空間保持材7と、を含む。【選択図】図1
CONSTRUCTION METHOD OF JOINT STRUCTURE AND JOINT STRUCTURE
PROBLEM TO BE SOLVED: To provide a construction method of a joint structure and the joint structure, capable of easily removing a member used for constructing the joint structure.SOLUTION: A construction method of a joint structure 1A comprises a first placing process of placing first concrete 3a and a joint member installation process of providing a joint member 4 for contacting in a surface with a part of a header surface 13a of the first concrete 3a and a second placing process of placing second concrete 3b so that a part of a header surface 13b contacts in a surface with the joint member 4. The joint member 4 includes a first plate member 6a for contacting in a surface with the header surface 13a of the first concrete 3a, a second plate member 6b separately opposed to the first plate member 6a and contacting in a surface with the header surface 13b of the second concrete 3b and a space holding material 7 interposed in a clearance between the first plate member 6a and the second plate member 6b.SELECTED DRAWING: Figure 1
【課題】目地構造の構築のために用いた部材を容易に除去することができる目地構造の構築方法、及び、目地構造を提供する。【解決手段】目地構造1Aの構築方法として、第1のコンクリート3aを打設する第1の打設工程と、第1のコンクリート3aの小口面13aの一部に面接触する目地用部材4を設ける目地用部材設置工程と、目地用部材4に小口面13bの一部が面接触するように第2のコンクリート3bを打設する第2の打設工程と、を有する。目地用部材4は、第1のコンクリート3aの小口面13aに面接触する第1の板部材6aと、第1の板部材6aに対し離間して対向するとともに第2のコンクリート3bの小口面13bに面接触する第2の板部材6bと、第1の板部材6aと第2の板部材6bとの隙間に介在する空間保持材7と、を含む。【選択図】図1
CONSTRUCTION METHOD OF JOINT STRUCTURE AND JOINT STRUCTURE
目地構造の構築方法、及び、目地構造
WATANABE KENZO (author) / MATSUI MASAKI (author) / EGAMI MAKOTO (author) / SAKAI GORO (author)
2017-01-12
Patent
Electronic Resource
Japanese
European Patent Office | 2019
|JOINT STRUCTURE, AND JOINT CONSTRUCTION AND JOINT CONSTRUCTION METHOD
European Patent Office | 2018
|JOINT STRUCTURE, AND CONSTRUCTION METHOD OF JOINT STRUCTURE
European Patent Office | 2023
|JOINT STRUCTURE, AND CONSTRUCTION METHOD OF JOINT STRUCTURE
European Patent Office | 2019
|JOINT STRUCTURE AND CONSTRUCTION METHOD OF JOINT STRUCTURE
European Patent Office | 2024
|