A platform for research: civil engineering, architecture and urbanism
METHOD FOR MAKING FOUNDATION PILE
PROBLEM TO BE SOLVED: To provide a method for making a foundation pile by all casing method that enables one-stop execution easily and safely by using one crane device.SOLUTION: A method for making a foundation pile uses a crane device for elastically mounting an elastic boom to a base machine in the horizontal direction and having a boom 10 pivotable in a horizontal plane. The method is characterized by comprising: a step of moving a casing tube 80 suspended by the crane device 1 to a predetermined position, and press-fitting the casing tube to the ground in the position; a step of drilling the inside of the casing tube press-fitted to the ground by an excavator; a step of suspending a rebar basket and building it in the inside of the drilling; and a step of suspending the casing tube to be pulled up with concrete placement placed inside of the drilling and moving it from the predetermined position.SELECTED DRAWING: Figure 1
【課題】 1つのクレーン装置を使用することにより、容易かつ安全にワンストップ実行可能なオールケーシング工法による基礎杭の造成方法を提供する。【解決手段】 基礎杭の造成方法は、伸縮可能なブームを、水平方向に伸縮自在にベースマシンに取り付け、前記ブーム10が水平面内で旋回可能なクレーン装置を用いる。前記クレーン装置1によって吊り下げられたケーシングチューブ80を所定の位置まで移動して、当該位置で地盤に前記ケーシングチューブを圧入する工程と、掘削機によって地盤に圧入された前記ケーシングチューブ内を削孔する工程と、鉄筋カゴを吊り下げて前記削孔内部に建て込む工程と、前記削孔の内部に打設されるコンクリートの打設に伴い引き抜かれる前記ケーシングチューブを吊り下げて前記所定位置から移動させる工程と、を含むことを特徴とする。【選択図】 図1
METHOD FOR MAKING FOUNDATION PILE
PROBLEM TO BE SOLVED: To provide a method for making a foundation pile by all casing method that enables one-stop execution easily and safely by using one crane device.SOLUTION: A method for making a foundation pile uses a crane device for elastically mounting an elastic boom to a base machine in the horizontal direction and having a boom 10 pivotable in a horizontal plane. The method is characterized by comprising: a step of moving a casing tube 80 suspended by the crane device 1 to a predetermined position, and press-fitting the casing tube to the ground in the position; a step of drilling the inside of the casing tube press-fitted to the ground by an excavator; a step of suspending a rebar basket and building it in the inside of the drilling; and a step of suspending the casing tube to be pulled up with concrete placement placed inside of the drilling and moving it from the predetermined position.SELECTED DRAWING: Figure 1
【課題】 1つのクレーン装置を使用することにより、容易かつ安全にワンストップ実行可能なオールケーシング工法による基礎杭の造成方法を提供する。【解決手段】 基礎杭の造成方法は、伸縮可能なブームを、水平方向に伸縮自在にベースマシンに取り付け、前記ブーム10が水平面内で旋回可能なクレーン装置を用いる。前記クレーン装置1によって吊り下げられたケーシングチューブ80を所定の位置まで移動して、当該位置で地盤に前記ケーシングチューブを圧入する工程と、掘削機によって地盤に圧入された前記ケーシングチューブ内を削孔する工程と、鉄筋カゴを吊り下げて前記削孔内部に建て込む工程と、前記削孔の内部に打設されるコンクリートの打設に伴い引き抜かれる前記ケーシングチューブを吊り下げて前記所定位置から移動させる工程と、を含むことを特徴とする。【選択図】 図1
METHOD FOR MAKING FOUNDATION PILE
基礎杭の造成方法
UEDA MASAKI (author) / KAJI KUNIO (author) / NISHIO KEITA (author)
2017-01-12
Patent
Electronic Resource
Japanese
European Patent Office | 2015
|PILE FOUNDATION REPAIR METHOD, PILE FOUNDATION REPAIR KIT, AND PILE FOUNDATION STRUCTURE
European Patent Office | 2016
|