A platform for research: civil engineering, architecture and urbanism
FOUNDATION IMPROVEMENT UNIT AND FOUNDATION IMPROVING MACHINE
PROBLEM TO BE SOLVED: To enable a long pile to be installed.SOLUTION: A foundation improvement unit 3 comprises: a leader 9; an attached leader 10; an endless chain 19; a drive sprocket 21; a feed motor 22; and a pair of tension rollers 23, 24. The drive sprocket 21 causes the endless chain 19 to travel by being hooked on the endless chain 19 above the leader 9 and rotating. The feed motor 22 is disposed above the leader 9 and rotates the drive sprocket 21. The pair of tension rollers 23, 24 are hooked on the endless chain 19 below the drive sprocket 21. As a part of the endless chain 19, which is positioned above the leader 9 is bent backward, the drive sprocket 21 and the feed motor 22 are displaced toward a rear side of the leader 9, thus a space for erecting the attached leader 10 on an upper end of the leader 9 can be secured.SELECTED DRAWING: Figure 2
【課題】長い杭を打つことを可能にする。【解決手段】地盤改良ユニット3は、リーダ9と付属リーダ10とエンドレスチェーン19と駆動用スプロケット21とフィードモータ22と1対のテンションローラ23,24等を備えている。駆動用スプロケット21は、リーダ9における上方においてエンドレスチェーン19に引っ掛けられ、回転することでエンドレスチェーン19を走行させる。フィードモータ22は、リーダ9における上方に設けられ、駆動用スプロケット21を回転させる。1対のテンションローラ23,24は、駆動用スプロケット21よりも下方でエンドレスチェーン19に引っ掛けられ、エンドレスチェーン19のうちのリーダ9における上方に位置する部分を後方に屈曲させていることで、駆動用スプロケット21及びフィードモータ22をリーダ9の後側にずらして配置させており、リーダ9の上端に付属リーダ10を立設させるスペースを確保している。【選択図】図2
FOUNDATION IMPROVEMENT UNIT AND FOUNDATION IMPROVING MACHINE
PROBLEM TO BE SOLVED: To enable a long pile to be installed.SOLUTION: A foundation improvement unit 3 comprises: a leader 9; an attached leader 10; an endless chain 19; a drive sprocket 21; a feed motor 22; and a pair of tension rollers 23, 24. The drive sprocket 21 causes the endless chain 19 to travel by being hooked on the endless chain 19 above the leader 9 and rotating. The feed motor 22 is disposed above the leader 9 and rotates the drive sprocket 21. The pair of tension rollers 23, 24 are hooked on the endless chain 19 below the drive sprocket 21. As a part of the endless chain 19, which is positioned above the leader 9 is bent backward, the drive sprocket 21 and the feed motor 22 are displaced toward a rear side of the leader 9, thus a space for erecting the attached leader 10 on an upper end of the leader 9 can be secured.SELECTED DRAWING: Figure 2
【課題】長い杭を打つことを可能にする。【解決手段】地盤改良ユニット3は、リーダ9と付属リーダ10とエンドレスチェーン19と駆動用スプロケット21とフィードモータ22と1対のテンションローラ23,24等を備えている。駆動用スプロケット21は、リーダ9における上方においてエンドレスチェーン19に引っ掛けられ、回転することでエンドレスチェーン19を走行させる。フィードモータ22は、リーダ9における上方に設けられ、駆動用スプロケット21を回転させる。1対のテンションローラ23,24は、駆動用スプロケット21よりも下方でエンドレスチェーン19に引っ掛けられ、エンドレスチェーン19のうちのリーダ9における上方に位置する部分を後方に屈曲させていることで、駆動用スプロケット21及びフィードモータ22をリーダ9の後側にずらして配置させており、リーダ9の上端に付属リーダ10を立設させるスペースを確保している。【選択図】図2
FOUNDATION IMPROVEMENT UNIT AND FOUNDATION IMPROVING MACHINE
地盤改良ユニット及び地盤改良機
SATO KATSUHIKO (author)
2017-02-02
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
FOUNDATION IMPROVEMENT UNIT AND FOUNDATION IMPROVING MACHINE
European Patent Office | 2017
|European Patent Office | 2016
|FOUNDATION IMPROVEMENT MATERIAL AND FOUNDATION IMPROVEMENT METHOD THEREFOR
European Patent Office | 2016
|