A platform for research: civil engineering, architecture and urbanism
FALLING-OFF PREVENTION METHOD AND FALLING-OFF PREVENTION STRUCTURE OF CEILING
PROBLEM TO BE SOLVED: To provide a falling-off prevention method of a ceiling for preserving an existing appearance, by preventing falling-off of the plastering finish ceiling.SOLUTION: A falling-off prevention method comprises a process of forming a reinforcement ceiling 18 by integrating a plastering finish ceiling 2 and a mesh sheet by sticking a mesh sheet 4 by an adhesive to an undersurface of the plastering finish ceiling 2, a process of fixing the reinforcement ceiling 18 and a ceiling fixture 8 by a bolt 6 by penetrating the bolt 6 through the reinforcement ceiling 18 and a process of applying painting similar to the plastering finish ceiling 2 to the reinforcement ceiling 18 and the undersurface of the bolt.SELECTED DRAWING: Figure 2
【課題】左官仕上げ天井の脱落を防止すると共に、既存の外観を保存する天井の脱落防止方法を提供する。【解決手段】左官仕上げ天井2の下面にメッシュシート4を接着剤で貼り付けて左官仕上げ天井2とメッシュシートとを一体化して補強天井18を形成する工程と、補強天井18にボルト6を貫通させ、ボルト6で補強天井18と天井固定具8とを固定する工程と、補強天井18及びボルトの下面に、左官仕上げ天井2と同様の塗装を施す工程と、を備える。【選択図】図2
FALLING-OFF PREVENTION METHOD AND FALLING-OFF PREVENTION STRUCTURE OF CEILING
PROBLEM TO BE SOLVED: To provide a falling-off prevention method of a ceiling for preserving an existing appearance, by preventing falling-off of the plastering finish ceiling.SOLUTION: A falling-off prevention method comprises a process of forming a reinforcement ceiling 18 by integrating a plastering finish ceiling 2 and a mesh sheet by sticking a mesh sheet 4 by an adhesive to an undersurface of the plastering finish ceiling 2, a process of fixing the reinforcement ceiling 18 and a ceiling fixture 8 by a bolt 6 by penetrating the bolt 6 through the reinforcement ceiling 18 and a process of applying painting similar to the plastering finish ceiling 2 to the reinforcement ceiling 18 and the undersurface of the bolt.SELECTED DRAWING: Figure 2
【課題】左官仕上げ天井の脱落を防止すると共に、既存の外観を保存する天井の脱落防止方法を提供する。【解決手段】左官仕上げ天井2の下面にメッシュシート4を接着剤で貼り付けて左官仕上げ天井2とメッシュシートとを一体化して補強天井18を形成する工程と、補強天井18にボルト6を貫通させ、ボルト6で補強天井18と天井固定具8とを固定する工程と、補強天井18及びボルトの下面に、左官仕上げ天井2と同様の塗装を施す工程と、を備える。【選択図】図2
FALLING-OFF PREVENTION METHOD AND FALLING-OFF PREVENTION STRUCTURE OF CEILING
天井の脱落防止方法及び脱落防止構造
MATSUBARA MASAYOSHI (author) / KITAZAWA TOSHITARO (author) / KUROSE YUKINOBU (author) / MASAFUJI MICHIHIRO (author) / OGAWA HIROSHI (author) / TAMURA MIKA (author)
2017-02-02
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
ROOF TILE FALLING/SCATTERING PREVENTION METHOD AND ROOF TILE FALLING/SCATTERING PREVENTION STRUCTURE
European Patent Office | 2021
|TILE FALLING AND SCATTERING PREVENTION METHOD AND TILE FALLING AND SCATTERING PREVENTION STRUCTURE
European Patent Office | 2021
|FALLING PREVENTION MEMBER INSTALLATION DEVICE AND FALLING PREVENTION MEMBER INSTALLATION METHOD
European Patent Office | 2023
|