SUSPENDED SCAFFOLDING, ERECTION METHOD FOR SUSPENDED SCAFFOLDING, AND HANGER
PROBLEM TO BE SOLVED: To provide means excellent in a reduction in construction cost and convenience of construction, even without arrangements for a dedicated horizontal member and diversion of a horizontal member.SOLUTION: A hanger B, which is arranged astride bottoms of a plurality of scaffolding boards A connected to each other in field assembling of suspended scaffolding and which can be connected to a cable in the state of being exposed above scaffolding boards from a gap between the scaffolding boards, is attached to the scaffolding board. Subsequently, the cable connected to the hanger is pulled to lift the suspended scaffolding. After the scaffolding board is suspended from a structure or a building, the cable is detached from the hanger to complete erection of the suspended scaffolding.SELECTED DRAWING: Figure 1
【課題】専用の横架材の手配や、横架材の転用を行わずとも、施工コストの低減や施工上の利便性に優れる手段を提供すること。【解決手段】吊り足場の地組の際に、互いに連結する複数の足場板Aの底部を跨ぐように配置し、且つ足場板間の隙間から足場板の上方に露出して索条と連結可能な吊金具Bを、足場板に取付ける。その後、吊金具に連結した索条を牽引して吊り足場を吊り上げ、構築物又は建設物に足場板を懸吊してから、吊金具から索条を取り外して、吊り足場の架設を完成する。【選択図】図1
SUSPENDED SCAFFOLDING, ERECTION METHOD FOR SUSPENDED SCAFFOLDING, AND HANGER
PROBLEM TO BE SOLVED: To provide means excellent in a reduction in construction cost and convenience of construction, even without arrangements for a dedicated horizontal member and diversion of a horizontal member.SOLUTION: A hanger B, which is arranged astride bottoms of a plurality of scaffolding boards A connected to each other in field assembling of suspended scaffolding and which can be connected to a cable in the state of being exposed above scaffolding boards from a gap between the scaffolding boards, is attached to the scaffolding board. Subsequently, the cable connected to the hanger is pulled to lift the suspended scaffolding. After the scaffolding board is suspended from a structure or a building, the cable is detached from the hanger to complete erection of the suspended scaffolding.SELECTED DRAWING: Figure 1
【課題】専用の横架材の手配や、横架材の転用を行わずとも、施工コストの低減や施工上の利便性に優れる手段を提供すること。【解決手段】吊り足場の地組の際に、互いに連結する複数の足場板Aの底部を跨ぐように配置し、且つ足場板間の隙間から足場板の上方に露出して索条と連結可能な吊金具Bを、足場板に取付ける。その後、吊金具に連結した索条を牽引して吊り足場を吊り上げ、構築物又は建設物に足場板を懸吊してから、吊金具から索条を取り外して、吊り足場の架設を完成する。【選択図】図1
SUSPENDED SCAFFOLDING, ERECTION METHOD FOR SUSPENDED SCAFFOLDING, AND HANGER
吊り足場、吊り足場の架設方法および吊金具