PRECAST STRUCTURE SKELETON, UNDERGROUND STRUCTURE, OFFSHORE FLOATING BODY STRUCTURE, AND CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE
PROBLEM TO BE SOLVED: To provide a precast structure skeleton and the like that are capable of thinning down the thickness of a member by using arch action, have excellent water cut-off performance, and enable drastic reduction in a construction period.SOLUTION: Each of a lower segment 3a and upper segment 3b includes a first projection, a guide projection 5, and a second projection, a coupling projection 7. A pair of guide projections 5 is formed on part on an arc of each of the semicircular lower segment 3a and upper segment 3b. Guide projections 5 are formed on the lower segment 3a's outer peripheral surface. The guide projections 5 are formed on both sides in the lower segment 3a's width direction (longer direction of a precast structure skeleton 1). The guide projections 5 have a formed hole. Aligning hole positions of lower segments 3a adjacent to each other in the width direction aligns both holes on an approximately straight line; in other words, the guide projections 5 function as positioning guides in coupling the lower segments 3a in the longer direction.SELECTED DRAWING: Figure 2
【課題】アーチアクションを利用して、部材の厚みを薄くすることが可能であり、止水性にも優れ、大幅な工期短縮が可能なプレキャスト構造体等を提供する。【解決手段】下部セグメント3aおよび上部セグメント3bは、それぞれ、第1の突部であるガイド突部5と、第2の突部である結合突部7を有する。ガイド突部5は、半円状の下部セグメント3aおよび上部セグメント3bの円弧上の部位に、一対形成される。ガイド突部5は、下部セグメント3aの外周面に形成される。ガイド突部5は、下部セグメント3aの幅方向(プレキャスト構造体1の長手方向)の両側に形成される。ガイド突部5には孔が形成される。幅方向に隣り合う下部セグメント3a同士の孔の位置を合わせることで、互いの孔が略直線上に配列する。すなわち、ガイド突部5は、下部セグメント3a同士の長手方向の連結における位置決めガイドとして機能する。【選択図】図2
PRECAST STRUCTURE SKELETON, UNDERGROUND STRUCTURE, OFFSHORE FLOATING BODY STRUCTURE, AND CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE
PROBLEM TO BE SOLVED: To provide a precast structure skeleton and the like that are capable of thinning down the thickness of a member by using arch action, have excellent water cut-off performance, and enable drastic reduction in a construction period.SOLUTION: Each of a lower segment 3a and upper segment 3b includes a first projection, a guide projection 5, and a second projection, a coupling projection 7. A pair of guide projections 5 is formed on part on an arc of each of the semicircular lower segment 3a and upper segment 3b. Guide projections 5 are formed on the lower segment 3a's outer peripheral surface. The guide projections 5 are formed on both sides in the lower segment 3a's width direction (longer direction of a precast structure skeleton 1). The guide projections 5 have a formed hole. Aligning hole positions of lower segments 3a adjacent to each other in the width direction aligns both holes on an approximately straight line; in other words, the guide projections 5 function as positioning guides in coupling the lower segments 3a in the longer direction.SELECTED DRAWING: Figure 2
【課題】アーチアクションを利用して、部材の厚みを薄くすることが可能であり、止水性にも優れ、大幅な工期短縮が可能なプレキャスト構造体等を提供する。【解決手段】下部セグメント3aおよび上部セグメント3bは、それぞれ、第1の突部であるガイド突部5と、第2の突部である結合突部7を有する。ガイド突部5は、半円状の下部セグメント3aおよび上部セグメント3bの円弧上の部位に、一対形成される。ガイド突部5は、下部セグメント3aの外周面に形成される。ガイド突部5は、下部セグメント3aの幅方向(プレキャスト構造体1の長手方向)の両側に形成される。ガイド突部5には孔が形成される。幅方向に隣り合う下部セグメント3a同士の孔の位置を合わせることで、互いの孔が略直線上に配列する。すなわち、ガイド突部5は、下部セグメント3a同士の長手方向の連結における位置決めガイドとして機能する。【選択図】図2
PRECAST STRUCTURE SKELETON, UNDERGROUND STRUCTURE, OFFSHORE FLOATING BODY STRUCTURE, AND CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE
プレキャスト構造体、地下構造物、洋上浮体構造物および地下構造物の施工方法
TANAKA HIDEO (author) / IKEUCHI YOSHIO (author) / MASUDA MASAHIRO (author)
2017-03-30
Patent
Electronic Resource
Japanese
PRECAST STRUCTURE, UNDERGROUND STRUCTURE, OCEAN FLOATING BODY STRUCTURE AND SEGMENT
European Patent Office | 2017
|PRECAST STRUCTURE, AND CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURES
European Patent Office | 2017
|CONSTRUCTION METHOD FOR CONCRETE SKELETON AND UNDERGROUND STRUCTURE
European Patent Office | 2021
|