CONNECTION METHOD FOR PRECAST BLOCKS
PROBLEM TO BE SOLVED: To provide a connection method or the like for precast blocks that enables precast blocks to be connected suitably.SOLUTION: When connecting precast blocks 1 to each other, an expansion mold 20 like a rubber balloon is disposed after laying out the blocks 1 on top and bottom leaving an interval in between, through a sheath pipe 13 of the blocks 1 laid out leaving an interval in between. Here, a top edge of the expansion mold 20 protrudes from the top block 1, while a bottom edge is positioned in the sheath pipe 13 of the bottom block 1. A filler 2 is filled between the blocks 1, after injecting air into and expanding the expansion mold 20. After filling the filler 2, the air is discharged from the expansion mold 20 to shrink for taking out the expansion mold from the sheath pipe 13 of the top block 1. A tensioning material is inserted into the sheath pipe 13 of the blocks 1 and tension is applied, thus introducing pre-stress to the blocks 1.SELECTED DRAWING: Figure 2
【課題】プレキャストブロックの接合を好適に行うことができるプレキャストブロックの接合方法等を提供する。【解決手段】プレキャストブロック1同士を接合する際に、両ブロック1を間隔を空けて上下に配置した後、ゴム風船状の膨張型20を、間隔を空けて配置された両ブロック1のシース管13の間を通して配置する。この時、膨張型20の上端部は上方のブロック1から突出し、下端部は下方のブロック1のシース管13内に位置する。膨張型20に空気を注入して膨張させた後、両ブロック1の間に充填材2を充填する。充填材2の充填後、膨張型20から空気を抜いて収縮させ、上方のブロック1のシース管13から引き出し、両ブロック1のシース管13に緊張材を通して緊張し、両ブロック1にプレストレスを導入する。【選択図】図2
CONNECTION METHOD FOR PRECAST BLOCKS
PROBLEM TO BE SOLVED: To provide a connection method or the like for precast blocks that enables precast blocks to be connected suitably.SOLUTION: When connecting precast blocks 1 to each other, an expansion mold 20 like a rubber balloon is disposed after laying out the blocks 1 on top and bottom leaving an interval in between, through a sheath pipe 13 of the blocks 1 laid out leaving an interval in between. Here, a top edge of the expansion mold 20 protrudes from the top block 1, while a bottom edge is positioned in the sheath pipe 13 of the bottom block 1. A filler 2 is filled between the blocks 1, after injecting air into and expanding the expansion mold 20. After filling the filler 2, the air is discharged from the expansion mold 20 to shrink for taking out the expansion mold from the sheath pipe 13 of the top block 1. A tensioning material is inserted into the sheath pipe 13 of the blocks 1 and tension is applied, thus introducing pre-stress to the blocks 1.SELECTED DRAWING: Figure 2
【課題】プレキャストブロックの接合を好適に行うことができるプレキャストブロックの接合方法等を提供する。【解決手段】プレキャストブロック1同士を接合する際に、両ブロック1を間隔を空けて上下に配置した後、ゴム風船状の膨張型20を、間隔を空けて配置された両ブロック1のシース管13の間を通して配置する。この時、膨張型20の上端部は上方のブロック1から突出し、下端部は下方のブロック1のシース管13内に位置する。膨張型20に空気を注入して膨張させた後、両ブロック1の間に充填材2を充填する。充填材2の充填後、膨張型20から空気を抜いて収縮させ、上方のブロック1のシース管13から引き出し、両ブロック1のシース管13に緊張材を通して緊張し、両ブロック1にプレストレスを導入する。【選択図】図2
CONNECTION METHOD FOR PRECAST BLOCKS
プレキャストブロックの接合方法
MATSUURA MASANORI (author) / OKUBO KAZUMASA (author) / YOKOTA YUKI (author)
2017-04-13
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
CONNECTION STRUCTURE FOR PRECAST BLOCKS, AND STRUCTURAL BODY
European Patent Office | 2017
|Slope protection capable of completely ensuring tight connection between precast blocks
European Patent Office | 2024
|CONNECTION STRUCTURE OF PRECAST PANELS, AND CONNECTION METHOD OF PRECAST PANELS
European Patent Office | 2022
|CONNECTION STRUCTURE OF PRECAST PANELS, AND CONNECTION METHOD OF PRECAST PANELS
European Patent Office | 2022
|Precast concrete hollow blocks
Engineering Index Backfile | 1940