PIPING STRUCTURE AT COLLECTIVE HOUSING
PROBLEM TO BE SOLVED: To provide a piping structure at collective housing capable of reducing the number of man-hour.SOLUTION: A second floor 12 of a collective housing has several dwelling units, common corridors communicated with each of these dwelling units and a water heater installation space 22 arranged for every dwelling unit. The installation space 22 is composed of a concave space. Walls 24 to 26 are arranged around the installation space, their floors are formed with a water-resistant layer. Several pipes 75 to 78 are connected to a water heater 21, a water supply pipe 75, a gas pipe 76 and a drain pipe 78 of these pipes 75 to 78 are concave from the installation 22 inside the wall 25 and they extend through the inside of the wall 25 and extend more downward from the floor part.SELECTED DRAWING: Figure 4
【課題】施工工数の低減を図ることができる集合住宅における配管構造を提供する。【解決手段】集合住宅の二階部分12には、複数の住戸と、それら各住戸に通じる共用廊下と、住戸ごとに設けられた給湯器の設置スペース22とが設けられている。設置スペース22は、共用廊下から住戸側に凹んだ凹状スペースからなり、その周囲には壁部24〜26が設けられ、その床部には防水層が形成されている。給湯器21には複数の配管75〜78が接続され、それらの配管75〜78のうち給水配管75、ガス配管76及びドレン配管78については設置スペース22から壁部25の内部へ入り込んで、その壁部25の内部を通じて床部よりも下方へ延びている。【選択図】 図4
PIPING STRUCTURE AT COLLECTIVE HOUSING
PROBLEM TO BE SOLVED: To provide a piping structure at collective housing capable of reducing the number of man-hour.SOLUTION: A second floor 12 of a collective housing has several dwelling units, common corridors communicated with each of these dwelling units and a water heater installation space 22 arranged for every dwelling unit. The installation space 22 is composed of a concave space. Walls 24 to 26 are arranged around the installation space, their floors are formed with a water-resistant layer. Several pipes 75 to 78 are connected to a water heater 21, a water supply pipe 75, a gas pipe 76 and a drain pipe 78 of these pipes 75 to 78 are concave from the installation 22 inside the wall 25 and they extend through the inside of the wall 25 and extend more downward from the floor part.SELECTED DRAWING: Figure 4
【課題】施工工数の低減を図ることができる集合住宅における配管構造を提供する。【解決手段】集合住宅の二階部分12には、複数の住戸と、それら各住戸に通じる共用廊下と、住戸ごとに設けられた給湯器の設置スペース22とが設けられている。設置スペース22は、共用廊下から住戸側に凹んだ凹状スペースからなり、その周囲には壁部24〜26が設けられ、その床部には防水層が形成されている。給湯器21には複数の配管75〜78が接続され、それらの配管75〜78のうち給水配管75、ガス配管76及びドレン配管78については設置スペース22から壁部25の内部へ入り込んで、その壁部25の内部を通じて床部よりも下方へ延びている。【選択図】 図4
PIPING STRUCTURE AT COLLECTIVE HOUSING
集合住宅における配管構造