SUPPORT LEG FOR ADDITIONAL CONSTRUCTION OF DOUBLE FLOOR, DOUBLE FLOOR STRUCTURE AND ADDITIONAL CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To easily satisfy needs such as a change in a room layout, by facilitating its addition and removal, by installing a support leg under a floor without tearing off a backing panel.SOLUTION: A support leg 10 for additional construction capable of supporting a floor panel in a double floor of laying the floor panel above a foundation floor 3, comprises a pedestal 20 arranged on the foundation floor 3, an adjuster bolt 30 vertically supported by the pedestal 20 and a floor panel receiver 40 having a female screw part 45 engaging with the adjuster bolt 30 and capable of adjusting a height by vertically moving in response to rotary operation, and the pedestal 20 is formed in a size storable in a photographing area when photographing the floor panel receiver 40 downward from above in the vertical direction, and the floor panel receiver 40 is provided by deviating the female screw part 45 in the horizontal direction to a receiving part 41 for placing the floor panel.SELECTED DRAWING: Figure 1
【課題】下地パネルを剥がさなくても床の下方に支持脚を設置できるようにして、その追加や撤去を容易にし、間取りの変更等のニーズを容易に満たす。【解決手段】基礎床3の上方に床パネルを敷設してなる二重床における床パネルを支持可能な追加施工用支持脚10であって、基礎床3上に配置される台座20と、台座20に垂直に支持されるアジャスターボルト30と、アジャスターボルト30に係合する雌ねじ部45を有して回転動作に伴い上下移動し高さを調節可能な床パネル受け40とを備え、台座20は、床パネル受け40を垂直方向上方から下方に投影したときの投影領域内に収まる大きさに形成され、床パネル受け40は、床パネルを載置する受け部41に対して雌ねじ部45が水平方向にずれて設けられている。【選択図】 図1
SUPPORT LEG FOR ADDITIONAL CONSTRUCTION OF DOUBLE FLOOR, DOUBLE FLOOR STRUCTURE AND ADDITIONAL CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To easily satisfy needs such as a change in a room layout, by facilitating its addition and removal, by installing a support leg under a floor without tearing off a backing panel.SOLUTION: A support leg 10 for additional construction capable of supporting a floor panel in a double floor of laying the floor panel above a foundation floor 3, comprises a pedestal 20 arranged on the foundation floor 3, an adjuster bolt 30 vertically supported by the pedestal 20 and a floor panel receiver 40 having a female screw part 45 engaging with the adjuster bolt 30 and capable of adjusting a height by vertically moving in response to rotary operation, and the pedestal 20 is formed in a size storable in a photographing area when photographing the floor panel receiver 40 downward from above in the vertical direction, and the floor panel receiver 40 is provided by deviating the female screw part 45 in the horizontal direction to a receiving part 41 for placing the floor panel.SELECTED DRAWING: Figure 1
【課題】下地パネルを剥がさなくても床の下方に支持脚を設置できるようにして、その追加や撤去を容易にし、間取りの変更等のニーズを容易に満たす。【解決手段】基礎床3の上方に床パネルを敷設してなる二重床における床パネルを支持可能な追加施工用支持脚10であって、基礎床3上に配置される台座20と、台座20に垂直に支持されるアジャスターボルト30と、アジャスターボルト30に係合する雌ねじ部45を有して回転動作に伴い上下移動し高さを調節可能な床パネル受け40とを備え、台座20は、床パネル受け40を垂直方向上方から下方に投影したときの投影領域内に収まる大きさに形成され、床パネル受け40は、床パネルを載置する受け部41に対して雌ねじ部45が水平方向にずれて設けられている。【選択図】 図1
SUPPORT LEG FOR ADDITIONAL CONSTRUCTION OF DOUBLE FLOOR, DOUBLE FLOOR STRUCTURE AND ADDITIONAL CONSTRUCTION METHOD THEREOF
二重床の追加施工用支持脚及び二重床構造、その追加施工方法
KAKEHASHI KIDAI (author) / KAKEHASHI HIROKI (author) / OASHI KENICHIRO (author)
2017-06-22
Patent
Electronic Resource
Japanese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
FLOOR SUPPORT, DOUBLE FLOOR STRUCTURE AND DOUBLE FLOOR STRUCTURE CONSTRUCTION METHOD
European Patent Office | 2017
|DOUBLE FLOOR SUPPORT LEG, DOUBLE FLOOR STRUCTURE OF USING THE SAME AND CONSTRUCTION METHOD THEREOF