RETAINING WALL CONCRETE BLOCK CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a retaining wall concrete block construction method to further strengthen installation of a retaining wall concrete block.SOLUTION: A retaining wall concrete block construction method has a wall part 2 and an inclined bottom plate part 3 that continues to a lower part of the wall part 2 and inclines downward. The method comprises at least: a foundation formation process to form a foundation 80 in order to install a retaining wall concrete block 1; an installation process to install the retaining wall concrete block 1 on the foundation 80; an installation process to install a concrete 200 into a space 300 formed between the inclined bottom plate part 3 and the foundation 80 from a lateral surface of the inclined bottom plate part 3; and a fill process to make a fill 101 on a top face of the inclined bottom plate part 3.SELECTED DRAWING: Figure 6
【課題】擁壁用コンクリートブロックの据付けをより強固なものとするための擁壁用コンクリートブロック施工方法を提供する。【解決手段】壁部2と壁部2の下部に連続する下り勾配の傾斜底板部3とを備える擁壁用コンクリートブロックの施工方法であって、擁壁用コンクリートブロック1を設置するための基礎80を形成する基礎形成工程と、基礎80に擁壁用コンクリートブロック1を設置する設置工程と、傾斜底板部3と基礎80との間に形成される空間300に傾斜底板部3の側面からコンクリート200を打設する打設工程と、傾斜底板部3の上面に盛り土101をする盛り土工程とを、少なくとも有するものである。【選択図】図6
RETAINING WALL CONCRETE BLOCK CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a retaining wall concrete block construction method to further strengthen installation of a retaining wall concrete block.SOLUTION: A retaining wall concrete block construction method has a wall part 2 and an inclined bottom plate part 3 that continues to a lower part of the wall part 2 and inclines downward. The method comprises at least: a foundation formation process to form a foundation 80 in order to install a retaining wall concrete block 1; an installation process to install the retaining wall concrete block 1 on the foundation 80; an installation process to install a concrete 200 into a space 300 formed between the inclined bottom plate part 3 and the foundation 80 from a lateral surface of the inclined bottom plate part 3; and a fill process to make a fill 101 on a top face of the inclined bottom plate part 3.SELECTED DRAWING: Figure 6
【課題】擁壁用コンクリートブロックの据付けをより強固なものとするための擁壁用コンクリートブロック施工方法を提供する。【解決手段】壁部2と壁部2の下部に連続する下り勾配の傾斜底板部3とを備える擁壁用コンクリートブロックの施工方法であって、擁壁用コンクリートブロック1を設置するための基礎80を形成する基礎形成工程と、基礎80に擁壁用コンクリートブロック1を設置する設置工程と、傾斜底板部3と基礎80との間に形成される空間300に傾斜底板部3の側面からコンクリート200を打設する打設工程と、傾斜底板部3の上面に盛り土101をする盛り土工程とを、少なくとも有するものである。【選択図】図6
RETAINING WALL CONCRETE BLOCK CONSTRUCTION METHOD
擁壁用コンクリートブロック施工方法
SAIKI SHIGENOBU (author)
2017-08-31
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated retaining wall block and retaining wall construction method
European Patent Office | 2022
|A retaining wall block and construction method of retaining wall using by retaining wall block
European Patent Office | 2017
|CONCRETE BLOCK FOR RETAINING WALL AND CONCRETE BLOCK MANUFACTURING FRAMEWORK FOR RETAINING WALL
European Patent Office | 2017
|