FLOOR PLATE FIXTURE OF TEMPORARY STRUCTURE
PROBLEM TO BE SOLVED: To provide a floor plate fixture for solving problems in which the annealing wire extends relatively easily when a floor plate of a temporary structure is constituted by a wooden strip material and fixed by using the annealing wire, and therefore the annealing wire springs out and is easily caught, and also the replacement work becomes necessary frequently.SOLUTION: A floor plate fixture 1 is constituted of a relay body 3 with two female screws 5, 7 facing vertically and having a reverse screw relationship to each other, a shaft 9 with a male screw 11 screwed to the female screw 5 of the relay body 3 and a hooking part 13 at both ends, a shaft 15 with a male screw part 17 screwed to the female screw 7 of the relay body 3 and a hooking part 19 at both ends, an abutment plate 23, a suspension plate 25, and an attachment body 21 with a hole 27. The shafts 9, 15 are screwed to the relay body 3 and are shaped in the shaft, and the length can be adjusted by rotating the relay body 3. The attachment body 21 of a separate member is used, and thereby it is not needed to form the hole in a strip material 29 side.SELECTED DRAWING: Figure 6
【課題】仮設構造物の床板を木製の切板で構成したときに、番線を使用して固定すると番線が比較的容易に伸びてしまうため、番線が飛び出して引っ掛かり易くなるだけでなく、交換作業が頻繁に必要となっている。【解決手段】上下方向に対向して互いに逆ネジ関係の二つの雌ネジ部5、7を備えた中継体3と、両端に中継体3の雌ネジ部5に螺合する雄ネジ部11と掛止部13を備えたシャフト部9と、両端に中継体3の雌ネジ部7に螺合する雄ネジ部17と掛止部19を備えたシャフト部15と、当接板23と、吊架板25と、孔部27を備えた取付け体21とで構成された床板固定具1。中継体3にシャフト部9、15が螺合されて軸状になっており、中継体3を回転することで、長さを調整できる。別体の取付け体21を利用することで、切板29側には孔を形成する必要がない。【選択図】 図6
FLOOR PLATE FIXTURE OF TEMPORARY STRUCTURE
PROBLEM TO BE SOLVED: To provide a floor plate fixture for solving problems in which the annealing wire extends relatively easily when a floor plate of a temporary structure is constituted by a wooden strip material and fixed by using the annealing wire, and therefore the annealing wire springs out and is easily caught, and also the replacement work becomes necessary frequently.SOLUTION: A floor plate fixture 1 is constituted of a relay body 3 with two female screws 5, 7 facing vertically and having a reverse screw relationship to each other, a shaft 9 with a male screw 11 screwed to the female screw 5 of the relay body 3 and a hooking part 13 at both ends, a shaft 15 with a male screw part 17 screwed to the female screw 7 of the relay body 3 and a hooking part 19 at both ends, an abutment plate 23, a suspension plate 25, and an attachment body 21 with a hole 27. The shafts 9, 15 are screwed to the relay body 3 and are shaped in the shaft, and the length can be adjusted by rotating the relay body 3. The attachment body 21 of a separate member is used, and thereby it is not needed to form the hole in a strip material 29 side.SELECTED DRAWING: Figure 6
【課題】仮設構造物の床板を木製の切板で構成したときに、番線を使用して固定すると番線が比較的容易に伸びてしまうため、番線が飛び出して引っ掛かり易くなるだけでなく、交換作業が頻繁に必要となっている。【解決手段】上下方向に対向して互いに逆ネジ関係の二つの雌ネジ部5、7を備えた中継体3と、両端に中継体3の雌ネジ部5に螺合する雄ネジ部11と掛止部13を備えたシャフト部9と、両端に中継体3の雌ネジ部7に螺合する雄ネジ部17と掛止部19を備えたシャフト部15と、当接板23と、吊架板25と、孔部27を備えた取付け体21とで構成された床板固定具1。中継体3にシャフト部9、15が螺合されて軸状になっており、中継体3を回転することで、長さを調整できる。別体の取付け体21を利用することで、切板29側には孔を形成する必要がない。【選択図】 図6
FLOOR PLATE FIXTURE OF TEMPORARY STRUCTURE
仮設構造物の床板固定用具
TATARA CHIHIRO (author)
2018-01-18
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
TEMPORARY MATERIAL FIXTURE OF FOLDING PLATE STRUCTURE ROOF
European Patent Office | 2020
|European Patent Office | 2020
|