PROBLEM TO BE SOLVED: To provide a monitoring device capable of precisely grasping a cutting state of the original ground in a high pressure injection agitation method in real time.SOLUTION: In a cutting state monitoring device, a first arm 1 with a roller and a second arm 2 with a roller for imparting expansive pressure resilience by a spring 7 toward an inner wall of a measurement pipe 64, are rotatably installed on a support shaft 9 provided in a body part 4 at a predetermined interval, and first and second acceleration converters 5a and 5b covered with a cover member 6 are installed on an inner wall of the measurement pipe 64 in a central part of the body part 4 by turning the feeling receiving direction vertically. The first acceleration converter 5a and the second acceleration converter 5b are mutually installed at an interval of 90 degrees when viewed from above. A weight 12 is suspended on the lower end of the body part 4 via a suspension ring 11. A suspension wire 13 is connected to an upper end of the body part 4 via a suspension ring 10, and is constituted so as to be vertically movable by an electric hoist.SELECTED DRAWING: Figure 1
【課題】 高圧噴射撹拌工法における原地盤の切削状態を、リアルタイムに的確に把握し得るモニタリング装置を提供する。【解決手段】 切削状態モニタリング装置は、計測パイプ64の内壁に向けてばね7により拡圧弾力が付与された第1のローラ付きアーム1と、第2のローラ付きアーム2が、所定間隔を隔てて、本体部4に設けた支軸9に回動可能に取着され、本体部4の中央部には、カバー部材6で覆われた第1、第2の加速度変換器5a、5bが、計測パイプ64の内壁に受感方向を垂直に向けて取着されている。第1の加速度変換器5aと、第2の加速度変換器5bとは、上方から見て互いに90度の間隔を隔てて取着されている。本体部4の下端には、吊り環11を介して重り12が吊り下げられている。本体部4の上端には、吊り環10を介して吊り下げワイヤ13が連結され、電動巻上機で上下動可能に構成されている。【選択図】 図1
PROBLEM TO BE SOLVED: To provide a monitoring device capable of precisely grasping a cutting state of the original ground in a high pressure injection agitation method in real time.SOLUTION: In a cutting state monitoring device, a first arm 1 with a roller and a second arm 2 with a roller for imparting expansive pressure resilience by a spring 7 toward an inner wall of a measurement pipe 64, are rotatably installed on a support shaft 9 provided in a body part 4 at a predetermined interval, and first and second acceleration converters 5a and 5b covered with a cover member 6 are installed on an inner wall of the measurement pipe 64 in a central part of the body part 4 by turning the feeling receiving direction vertically. The first acceleration converter 5a and the second acceleration converter 5b are mutually installed at an interval of 90 degrees when viewed from above. A weight 12 is suspended on the lower end of the body part 4 via a suspension ring 11. A suspension wire 13 is connected to an upper end of the body part 4 via a suspension ring 10, and is constituted so as to be vertically movable by an electric hoist.SELECTED DRAWING: Figure 1
【課題】 高圧噴射撹拌工法における原地盤の切削状態を、リアルタイムに的確に把握し得るモニタリング装置を提供する。【解決手段】 切削状態モニタリング装置は、計測パイプ64の内壁に向けてばね7により拡圧弾力が付与された第1のローラ付きアーム1と、第2のローラ付きアーム2が、所定間隔を隔てて、本体部4に設けた支軸9に回動可能に取着され、本体部4の中央部には、カバー部材6で覆われた第1、第2の加速度変換器5a、5bが、計測パイプ64の内壁に受感方向を垂直に向けて取着されている。第1の加速度変換器5aと、第2の加速度変換器5bとは、上方から見て互いに90度の間隔を隔てて取着されている。本体部4の下端には、吊り環11を介して重り12が吊り下げられている。本体部4の上端には、吊り環10を介して吊り下げワイヤ13が連結され、電動巻上機で上下動可能に構成されている。【選択図】 図1
CUTTING STATE MONITORING DEVICE OF GROUND
地盤の切削状態モニタリング装置