A platform for research: civil engineering, architecture and urbanism
BUILDING UNIT, BUILDING, AND POWER SUPPLY SYSTEM
PROBLEM TO BE SOLVED: To provide a building unit, power supply system, etc. capable of supplying power to a specific location or specific power load in a building while suppressing power consumption by a backup power source without requiring complicated wiring work at a construction location, when power supply from a power system stops.SOLUTION: A building unit 1 constitutes part of a building 2 and is previously assembled at a location other than a construction location, the building unit including a facility previously installed at a location other than the construction location. In the building unit 1 and a power supply system 100, when power supply from a power system 110 to the building 2 stops, power is supplied from a backup power source installed at the construction location of the building 2 to the building unit 1.SELECTED DRAWING: Figure 6
【課題】電力系統からの電力供給が停止した場合に、バックアップ電源による電力の消費を抑えつつ、建設場所での複雑な配線工事を伴うことなく建物内の特定の場所又は特定の電力負荷に電力を供給することができる建物ユニット及び電力供給システム等を提供する。【解決手段】建物ユニット1は、建物2の一部を構成し、かつ、建設場所以外で予め組み立てられており、建設場所以外で予め設置された設備を有する。建物ユニット1及び電力供給システム100では、電力系統110から建物2への電力供給が停止した場合、建物2の建設場所に設置されるバックアップ電源から建物ユニット1に電力が供給される。【選択図】図6
BUILDING UNIT, BUILDING, AND POWER SUPPLY SYSTEM
PROBLEM TO BE SOLVED: To provide a building unit, power supply system, etc. capable of supplying power to a specific location or specific power load in a building while suppressing power consumption by a backup power source without requiring complicated wiring work at a construction location, when power supply from a power system stops.SOLUTION: A building unit 1 constitutes part of a building 2 and is previously assembled at a location other than a construction location, the building unit including a facility previously installed at a location other than the construction location. In the building unit 1 and a power supply system 100, when power supply from a power system 110 to the building 2 stops, power is supplied from a backup power source installed at the construction location of the building 2 to the building unit 1.SELECTED DRAWING: Figure 6
【課題】電力系統からの電力供給が停止した場合に、バックアップ電源による電力の消費を抑えつつ、建設場所での複雑な配線工事を伴うことなく建物内の特定の場所又は特定の電力負荷に電力を供給することができる建物ユニット及び電力供給システム等を提供する。【解決手段】建物ユニット1は、建物2の一部を構成し、かつ、建設場所以外で予め組み立てられており、建設場所以外で予め設置された設備を有する。建物ユニット1及び電力供給システム100では、電力系統110から建物2への電力供給が停止した場合、建物2の建設場所に設置されるバックアップ電源から建物ユニット1に電力が供給される。【選択図】図6
BUILDING UNIT, BUILDING, AND POWER SUPPLY SYSTEM
建物ユニット、建物及び電力供給システム
ARAKANE NORIHIDE (author)
2018-02-01
Patent
Electronic Resource
Japanese