A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To mitigate a burden in work.SOLUTION: A penetration testing method using a penetration testing device 1 includes an integrating compaction step S100 and a striking step S200. In the integrating compaction step S100, a double pipe 10 having a bottomed inner pipe 11 and a bottomless outer pipe 12 overlapped externally on the inner pipe 11 is penetrated into a ground while rotating. In the striking step S200, the inner pipe 11 is struck from above for deriving an N-value, while keeping the double pipe 10 underground that has been penetrated into the ground in the integrating compaction step S100. The double pipe 10 has a cylindrical spacer 13 fixed on an inner side at a bottom end of the outer pipe 12 and interposed between the inner pipe 11 and the outer pipe.SELECTED DRAWING: Figure 1
【課題】作業の負担を軽減する。【解決手段】貫入試験装置1による貫入試験方法は、一体圧密工程S100と打撃工程S200とを備えている。一体圧密工程S100では、有底の内管11、及び内管11の外側に重ねられている無底の外管12を有している二重管10を、回転させながら地盤に突き入れる。打撃工程S200では、一体圧密工程S100で地盤に突き入れられた二重管10を地中に維持したまま、N値を求めるために内管11を上方から打撃する。二重管10は、外管12の下端内側に固定されて内管11との間に介在している円筒形状のスペーサー13を有している。【選択図】図1
PROBLEM TO BE SOLVED: To mitigate a burden in work.SOLUTION: A penetration testing method using a penetration testing device 1 includes an integrating compaction step S100 and a striking step S200. In the integrating compaction step S100, a double pipe 10 having a bottomed inner pipe 11 and a bottomless outer pipe 12 overlapped externally on the inner pipe 11 is penetrated into a ground while rotating. In the striking step S200, the inner pipe 11 is struck from above for deriving an N-value, while keeping the double pipe 10 underground that has been penetrated into the ground in the integrating compaction step S100. The double pipe 10 has a cylindrical spacer 13 fixed on an inner side at a bottom end of the outer pipe 12 and interposed between the inner pipe 11 and the outer pipe.SELECTED DRAWING: Figure 1
【課題】作業の負担を軽減する。【解決手段】貫入試験装置1による貫入試験方法は、一体圧密工程S100と打撃工程S200とを備えている。一体圧密工程S100では、有底の内管11、及び内管11の外側に重ねられている無底の外管12を有している二重管10を、回転させながら地盤に突き入れる。打撃工程S200では、一体圧密工程S100で地盤に突き入れられた二重管10を地中に維持したまま、N値を求めるために内管11を上方から打撃する。二重管10は、外管12の下端内側に固定されて内管11との間に介在している円筒形状のスペーサー13を有している。【選択図】図1
PENETRATION TESTING METHOD AND DEVICE
貫入試験方法及び装置
SATO KATSUHIKO (author)
2018-02-08
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
PENETRATION TESTING DEVICE AND PENETRATION TESTING METHOD