PRECAST BLOCK AND INSTALLATION METHOD
PROBLEM TO BE SOLVED: To provide a precast block and an installation method that reduces labor and a necessary work space for transfer and installation.SOLUTION: A precast block 1a includes, from an onset, a fluid supply port 111 for supplying a fluid from outside of a body part 100a into the body part 100a, and a fluid downward ejection port 121 communicating with the fluid supply port 111 and ejecting the fluid supplied to the fluid supply port 111 downward the body part 100a, in addition to the body part 100a formed by precast concrete. As such, the body part 100a may be installed at an installation place if supply of the fluid to the fluid supply port 111 is suspended after transferring the precast block 1a to the installation place, without a need to remove a fluid caster. Therefore, labor and a work space necessary for transfer and installation may be reduced.SELECTED DRAWING: Figure 1
【課題】移動及び設置のための労力及び必要な作業空間を低減することが可能なプレキャストブロック及び施工方法を提供する。【解決手段】予めプレキャストブロック1aは、プレキャストコンクリートから形成された本体部100aに加えて、流体を本体部100aの外部から本体部100aの内部に供給される流体供給口部111と、流体供給口部111と連通し、流体供給口部111に供給された流体を本体部100aの下方に噴出する流体下方噴出口部121とを備えている。そのため、プレキャストブロック1aを設置場所に移動させた後に、流体供給口部111への流体の供給を中止すれば、設置場所に本体部100aを設置することができ、流体キャスターの除去の必要が無い。したがって、移動及び設置のための労力及び必要な作業空間を低減することが可能となる。【選択図】図1
PRECAST BLOCK AND INSTALLATION METHOD
PROBLEM TO BE SOLVED: To provide a precast block and an installation method that reduces labor and a necessary work space for transfer and installation.SOLUTION: A precast block 1a includes, from an onset, a fluid supply port 111 for supplying a fluid from outside of a body part 100a into the body part 100a, and a fluid downward ejection port 121 communicating with the fluid supply port 111 and ejecting the fluid supplied to the fluid supply port 111 downward the body part 100a, in addition to the body part 100a formed by precast concrete. As such, the body part 100a may be installed at an installation place if supply of the fluid to the fluid supply port 111 is suspended after transferring the precast block 1a to the installation place, without a need to remove a fluid caster. Therefore, labor and a work space necessary for transfer and installation may be reduced.SELECTED DRAWING: Figure 1
【課題】移動及び設置のための労力及び必要な作業空間を低減することが可能なプレキャストブロック及び施工方法を提供する。【解決手段】予めプレキャストブロック1aは、プレキャストコンクリートから形成された本体部100aに加えて、流体を本体部100aの外部から本体部100aの内部に供給される流体供給口部111と、流体供給口部111と連通し、流体供給口部111に供給された流体を本体部100aの下方に噴出する流体下方噴出口部121とを備えている。そのため、プレキャストブロック1aを設置場所に移動させた後に、流体供給口部111への流体の供給を中止すれば、設置場所に本体部100aを設置することができ、流体キャスターの除去の必要が無い。したがって、移動及び設置のための労力及び必要な作業空間を低減することが可能となる。【選択図】図1
PRECAST BLOCK AND INSTALLATION METHOD
プレキャストブロック及び施工方法
UEDA AKIRO (author) / YOKOZEKI KOSUKE (author) / YUGE TAKESHI (author) / TAIRA YOHEI (author) / KAWASAKI FUMIYOSHI (author) / OHAMA MASARU (author) / SOGABE NAOKI (author) / KONO TETSUYA (author) / SHIRAI SHUNSUKE (author) / SUGAI TAKAKO (author)
2018-03-08
Patent
Electronic Resource
Japanese
IPC:
E03F
SEWERS
,
Abwasserkanäle
PRECAST FLOOR SLAB INSTALLATION METHOD AND PRECAST FLOOR SLAB
European Patent Office | 2018
|SPACER MECHANISM, PRECAST BLOCK, AND METHOD FOR ARRANGING PRECAST BLOCK
European Patent Office | 2016
|Precast Block and Installation System for Construction of Walls and Slabs
European Patent Office | 2018
|Precast block and installation system for construction of walls and slabs
European Patent Office | 2020
|