A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF HOPPER SKELETON, AND HOPPER SECTION OF SILO
PROBLEM TO BE SOLVED: To provide a construction method of a hopper skeleton and a hopper section of a silo that save energy during the construction work and curtail a construction period, at the same time reducing a construction cost.SOLUTION: A construction method of a hopper skeleton includes a first inclined wall part formation step for forming a lower inclined wall part 71, and a second inclined wall formation step for forming an upper inclined wall part 72 above the lower inclined wall part 71. In the first inclined wall part formation step, a precast concrete plate 74 is installed in a PCa plate installation process, and a first lining plate 76 is installed leaving an interval from the precast concrete plate 74, and then concrete is cast between the precast concrete plate 74 and the first lining plate 76. In the second inclined wall part formation step, a second lining plate 77 is installed leaving an interval from the precast concrete plate 74 and a bottom end of a second lining plate 77 is fixed on a top end of the first lining plate 76, and then concrete is cast between the precast concrete plate 74 and the second lining plate 77.SELECTED DRAWING: Figure 7
【課題】施工時の省力化および工期短縮化を図るとともに、施工費の低減化を図ること可能としたホッパ躯体の施工方法およびサイロホッパ部を提案する。【解決手段】下斜め壁部71を形成する第一斜め壁部形成工程と、下斜め壁部71の上に上斜め壁部72を形成する第二斜め壁部形成工程とを備えている。第一斜め壁部形成工程では、プレキャストコンクリート板74を配設するPCa板配設作業と、プレキャストコンクリート板74から隙間をあけて第一ライニング板76を配置した後、プレキャストコンクリート板74と第一ライニング板76との間にコンクリートを打設する。第二斜め壁部形成工程では、プレキャストコンクリート板74から隙間をあけて第二ライニング板77を配置するとともに第一ライニング板76の上端に第二ライニング板77の下端を固定し、プレキャストコンクリート板74と第二ライニング板77との間にコンクリートを打設する。【選択図】図7
CONSTRUCTION METHOD OF HOPPER SKELETON, AND HOPPER SECTION OF SILO
PROBLEM TO BE SOLVED: To provide a construction method of a hopper skeleton and a hopper section of a silo that save energy during the construction work and curtail a construction period, at the same time reducing a construction cost.SOLUTION: A construction method of a hopper skeleton includes a first inclined wall part formation step for forming a lower inclined wall part 71, and a second inclined wall formation step for forming an upper inclined wall part 72 above the lower inclined wall part 71. In the first inclined wall part formation step, a precast concrete plate 74 is installed in a PCa plate installation process, and a first lining plate 76 is installed leaving an interval from the precast concrete plate 74, and then concrete is cast between the precast concrete plate 74 and the first lining plate 76. In the second inclined wall part formation step, a second lining plate 77 is installed leaving an interval from the precast concrete plate 74 and a bottom end of a second lining plate 77 is fixed on a top end of the first lining plate 76, and then concrete is cast between the precast concrete plate 74 and the second lining plate 77.SELECTED DRAWING: Figure 7
【課題】施工時の省力化および工期短縮化を図るとともに、施工費の低減化を図ること可能としたホッパ躯体の施工方法およびサイロホッパ部を提案する。【解決手段】下斜め壁部71を形成する第一斜め壁部形成工程と、下斜め壁部71の上に上斜め壁部72を形成する第二斜め壁部形成工程とを備えている。第一斜め壁部形成工程では、プレキャストコンクリート板74を配設するPCa板配設作業と、プレキャストコンクリート板74から隙間をあけて第一ライニング板76を配置した後、プレキャストコンクリート板74と第一ライニング板76との間にコンクリートを打設する。第二斜め壁部形成工程では、プレキャストコンクリート板74から隙間をあけて第二ライニング板77を配置するとともに第一ライニング板76の上端に第二ライニング板77の下端を固定し、プレキャストコンクリート板74と第二ライニング板77との間にコンクリートを打設する。【選択図】図7
CONSTRUCTION METHOD OF HOPPER SKELETON, AND HOPPER SECTION OF SILO
ホッパ躯体の施工方法およびサイロホッパ部
ISHIBASHI SHIGEO (author) / FUJINO HAJIME (author)
2018-03-22
Patent
Electronic Resource
Japanese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Construction Technology for Ultra-High Baseboard and Hopper of Silo
British Library Conference Proceedings | 2014
|Construction Technology for Ultra-High Baseboard and Hopper of Silo
Trans Tech Publications | 2014
|Silo and hopper discharge systems for difficult bulk materials
British Library Online Contents | 1998