FLOOR SLAB PAVEMENT STRUCTURE
PROBLEM TO BE SOLVED: To provide a floor slab pavement structure that achieves reinforcement of a floor slab without any change from the normal asphalt coating waterproof method and asphalt pavement construction method by rigidly adhering the floor slab of steel and an asphalt pavement consisting of an asphalt mixture layer with an adhesive waterproof layer interposed therebetween to integrate the floor slab and the asphalt pavement.SOLUTION: There is provided a floor slab pavement structure that reinforces a road bridge floor slab 1 of steel, the floor slab pavement structure having an adhesive waterproof layer 2 on the road bridge floor slab 1, and at least one or more asphalt mixture layers 3 on the adhesive waterproof layer 2, the adhesive waterproof layer 2 consisting of waterproof layer materials including a polyamide resin A, and the asphalt mixture layer 3 consisting of an asphalt mixture including a polyamide resin B.SELECTED DRAWING: Figure 1
【課題】通常のアスファルト塗膜防水工法とアスファルト舗装の施工法と何ら変わりなく、鋼製の床版とアスファルト混合物層からなるアスファルト舗装とを接着防水層を介して強固に接着し、床版とアスファルト舗装が一体となることで床版の補強を実現する床版舗装構造を提供する。【解決手段】鋼製の道路橋床版1を補強する床版舗装構造であって、該床版舗装構造が、前記道路橋床版1上に、接着防水層2を有し、該接着防水層2が、ポリアミド樹脂Aを含む防水層用材料からなり、該接着防水層2上に、ポリアミド樹脂Bを含むアスファルト混合物からなるアスファルト混合物層3を少なくとも1層以上備える床版舗装構造。【選択図】図1
FLOOR SLAB PAVEMENT STRUCTURE
PROBLEM TO BE SOLVED: To provide a floor slab pavement structure that achieves reinforcement of a floor slab without any change from the normal asphalt coating waterproof method and asphalt pavement construction method by rigidly adhering the floor slab of steel and an asphalt pavement consisting of an asphalt mixture layer with an adhesive waterproof layer interposed therebetween to integrate the floor slab and the asphalt pavement.SOLUTION: There is provided a floor slab pavement structure that reinforces a road bridge floor slab 1 of steel, the floor slab pavement structure having an adhesive waterproof layer 2 on the road bridge floor slab 1, and at least one or more asphalt mixture layers 3 on the adhesive waterproof layer 2, the adhesive waterproof layer 2 consisting of waterproof layer materials including a polyamide resin A, and the asphalt mixture layer 3 consisting of an asphalt mixture including a polyamide resin B.SELECTED DRAWING: Figure 1
【課題】通常のアスファルト塗膜防水工法とアスファルト舗装の施工法と何ら変わりなく、鋼製の床版とアスファルト混合物層からなるアスファルト舗装とを接着防水層を介して強固に接着し、床版とアスファルト舗装が一体となることで床版の補強を実現する床版舗装構造を提供する。【解決手段】鋼製の道路橋床版1を補強する床版舗装構造であって、該床版舗装構造が、前記道路橋床版1上に、接着防水層2を有し、該接着防水層2が、ポリアミド樹脂Aを含む防水層用材料からなり、該接着防水層2上に、ポリアミド樹脂Bを含むアスファルト混合物からなるアスファルト混合物層3を少なくとも1層以上備える床版舗装構造。【選択図】図1
FLOOR SLAB PAVEMENT STRUCTURE
床版舗装構造
WADA YOSHINORI (author) / SHIMOMO KOICHIRO (author) / HIROSE TAKESHI (author) / TAKAHASHI SHIGEKI (author) / MURAYAMA MASAHITO (author) / HIRATO TOSHIAKI (author) / HASHIMOTO RYOICHI (author)
2018-05-10
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
STEEL FLOOR SLAB UNIT WITH PAVEMENT ATTACHED AND FLOOR SLAB STRUCTURE