EXCAVATION EARTH REMOVAL DEVICE AND EXCAVATION EARTH REMOVAL METHOD
PROBLEM TO BE SOLVED: To implement an excavation earth removal device and excavation earth removal method, capable of preferably removing excavated earth.SOLUTION: An excavation earth removal device 100 comprises: a cylindrical body 10 installed on the upper part of a steel pipe pile P to be embedded in the ground, the cylindrical body having a side face on which an aperture 13a is formed; a first lifting device 20 disposed inside the cylindrical body 10; an excavating device 30 to be lifted or lowered by the first lifting device 20; a second lifting device 40 arranged outside the cylindrical body 10; and an excavated earth tank 50 to be lifted or lowered by the second lifting device 40. The excavating device 30 is configured to excavate the ground when descending inside the steel pipe pile P and carry excavated earth upwards when ascending inside the steel pipe pile P to remove the earth from the aperture 13a of the cylindrical body 10. The excavated earth tank 50 is configured to receive the earth removed from the aperture 13a of the cylindrical body 10 before descending to the vicinity of the ground and discharge the excavated earth in the tank before ascending to the cylindrical body 10.SELECTED DRAWING: Figure 1
【課題】掘削した排土を好適に排出することができる掘削排土装置及び掘削排土方法を実現する。【解決手段】地盤に埋入される鋼管杭Pの上部に設置され、側面に開口部13aが形成されている筒状体10と、筒状体10の内側に配設されている第1昇降装置20と、第1昇降装置20によって昇降される掘削装置30と、筒状体10の外側に配設されている第2昇降装置40と、第2昇降装置40によって昇降される排土タンク50とを備えた掘削排土装置100において、掘削装置30は、鋼管杭Pの内部を下降する際に地盤を掘削し、鋼管杭Pの内部を上昇する際に掘削した排土を上方へ搬送して筒状体10の開口部13aから排出するように構成され、排土タンク50は、筒状体10の開口部13aから排出された排土を収容した後、地盤近傍まで下降し、タンク内の排土を放出した後、筒状体10まで上昇するように構成されているようにした。【選択図】図1
EXCAVATION EARTH REMOVAL DEVICE AND EXCAVATION EARTH REMOVAL METHOD
PROBLEM TO BE SOLVED: To implement an excavation earth removal device and excavation earth removal method, capable of preferably removing excavated earth.SOLUTION: An excavation earth removal device 100 comprises: a cylindrical body 10 installed on the upper part of a steel pipe pile P to be embedded in the ground, the cylindrical body having a side face on which an aperture 13a is formed; a first lifting device 20 disposed inside the cylindrical body 10; an excavating device 30 to be lifted or lowered by the first lifting device 20; a second lifting device 40 arranged outside the cylindrical body 10; and an excavated earth tank 50 to be lifted or lowered by the second lifting device 40. The excavating device 30 is configured to excavate the ground when descending inside the steel pipe pile P and carry excavated earth upwards when ascending inside the steel pipe pile P to remove the earth from the aperture 13a of the cylindrical body 10. The excavated earth tank 50 is configured to receive the earth removed from the aperture 13a of the cylindrical body 10 before descending to the vicinity of the ground and discharge the excavated earth in the tank before ascending to the cylindrical body 10.SELECTED DRAWING: Figure 1
【課題】掘削した排土を好適に排出することができる掘削排土装置及び掘削排土方法を実現する。【解決手段】地盤に埋入される鋼管杭Pの上部に設置され、側面に開口部13aが形成されている筒状体10と、筒状体10の内側に配設されている第1昇降装置20と、第1昇降装置20によって昇降される掘削装置30と、筒状体10の外側に配設されている第2昇降装置40と、第2昇降装置40によって昇降される排土タンク50とを備えた掘削排土装置100において、掘削装置30は、鋼管杭Pの内部を下降する際に地盤を掘削し、鋼管杭Pの内部を上昇する際に掘削した排土を上方へ搬送して筒状体10の開口部13aから排出するように構成され、排土タンク50は、筒状体10の開口部13aから排出された排土を収容した後、地盤近傍まで下降し、タンク内の排土を放出した後、筒状体10まで上昇するように構成されているようにした。【選択図】図1
EXCAVATION EARTH REMOVAL DEVICE AND EXCAVATION EARTH REMOVAL METHOD
掘削排土装置及び掘削排土方法
KITAMURA MORIO (author) / TAUCHI HIROAKI (author) / ONO KATSUHIKO (author) / NONAKA KENGO (author)