A platform for research: civil engineering, architecture and urbanism
FORM UNIT AND SLOPE REINFORCEMENT METHOD
PROBLEM TO BE SOLVED: To provide a form unit and slope reinforcement method which can shorten the construction time.SOLUTION: A form unit includes L-shaped first to fourth side plates 11, 12, 13, 14 and connection bars 30x, 30y connecting these side plates. The connection bars 30x, 30y include: a pair of vertical axis bars 31; a plurality of vertical width bars 31x across them; a vertical auxiliary bar 33 intersecting them and located between the pair of vertical axis bars 31; a pair of horizontal axis bars 32; a plurality of horizontal width bars 32x across them; and a horizontal auxiliary bar 34 intersecting them and located between the pair of horizontal axis bars 32. A slope reinforcement method includes: a step of assembling a mold frame 10 from the form unit; a step of casting an anchor 21 on a slope G; a step of installing the mold frame 10 on the slope G; and a step of filling concrete or mortar C into the mold frame 10.SELECTED DRAWING: Figure 1
【課題】施工時間を短縮化することができる型枠ユニット及び法面補強工法とする。【解決手段】型枠ユニットを、L字状とされた第1〜第4側板11,12,13,14と、これらを連結する連結筋30x,30yとを有し、この連結筋30x,30yが、一対の縦軸筋31、これらの間に跨る複数の縦幅筋31x、及びこれらに交差し一対の縦軸筋31間に位置する縦補助筋33と、一対の横軸筋32、これらの間に跨る複数の横幅筋32x、及びこれらに交差し一対の横軸筋32間に位置する横補助筋34とを有するものとする。また、法面補強工法を、前記型枠ユニットから型枠10を組み立てる工程と、法面Gにアンカー21を打設する工程と、法面Gに型枠10を設置する工程と、型枠10内にコンクリート又はモルタルCを充填する工程とを有するものとする。【選択図】図1
FORM UNIT AND SLOPE REINFORCEMENT METHOD
PROBLEM TO BE SOLVED: To provide a form unit and slope reinforcement method which can shorten the construction time.SOLUTION: A form unit includes L-shaped first to fourth side plates 11, 12, 13, 14 and connection bars 30x, 30y connecting these side plates. The connection bars 30x, 30y include: a pair of vertical axis bars 31; a plurality of vertical width bars 31x across them; a vertical auxiliary bar 33 intersecting them and located between the pair of vertical axis bars 31; a pair of horizontal axis bars 32; a plurality of horizontal width bars 32x across them; and a horizontal auxiliary bar 34 intersecting them and located between the pair of horizontal axis bars 32. A slope reinforcement method includes: a step of assembling a mold frame 10 from the form unit; a step of casting an anchor 21 on a slope G; a step of installing the mold frame 10 on the slope G; and a step of filling concrete or mortar C into the mold frame 10.SELECTED DRAWING: Figure 1
【課題】施工時間を短縮化することができる型枠ユニット及び法面補強工法とする。【解決手段】型枠ユニットを、L字状とされた第1〜第4側板11,12,13,14と、これらを連結する連結筋30x,30yとを有し、この連結筋30x,30yが、一対の縦軸筋31、これらの間に跨る複数の縦幅筋31x、及びこれらに交差し一対の縦軸筋31間に位置する縦補助筋33と、一対の横軸筋32、これらの間に跨る複数の横幅筋32x、及びこれらに交差し一対の横軸筋32間に位置する横補助筋34とを有するものとする。また、法面補強工法を、前記型枠ユニットから型枠10を組み立てる工程と、法面Gにアンカー21を打設する工程と、法面Gに型枠10を設置する工程と、型枠10内にコンクリート又はモルタルCを充填する工程とを有するものとする。【選択図】図1
FORM UNIT AND SLOPE REINFORCEMENT METHOD
型枠ユニット及び法面補強工法
FUTAMI TOSHIHIKO (author) / UENOYAMA TAKENOBU (author)
2018-06-14
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2019
|European Patent Office | 2018
|SLOPE FACE REINFORCEMENT STRUCTURE AND SLOPE FACE REINFORCEMENT METHOD
European Patent Office | 2017
|