A platform for research: civil engineering, architecture and urbanism
COLUMN BASE STRUCTURE AND METHOD FOR CONSTRUCTING COLUMN BASE STRUCTURE
PROBLEM TO BE SOLVED: To provide a column base structure and the like comprising a wooden column body excellent in construction workability.SOLUTION: A column base hardware 21 is formed by connecting an upper plate 3 to a lower plate 5 with a steel pipe 15. The upper plate 3 and the lower plate 5 are arranged generally in parallel to each other. The upper plate 3 is positioned at a bottom edge of a wooden column body 13. The lower plate 5 is provided with a plurality of through holes through which a plurality of anchor bolts 9 are respectively inserted and are respectively fastened to the lower plate 5 with nuts. Cement mortar 7 is charged into a gap between the lower plate 5 and concrete 19. The anchor bolt 9 is fastened to the concrete 19 as the foundation.SELECTED DRAWING: Figure 1
【課題】 施工作業性に優れた木製柱体の柱脚構造等を提供する。【解決手段】 柱脚金物21は、上部プレート3と下部プレート5とが鋼管15を介して接合されて形成される。上部プレート3と下部プレート5は、互いに略平行に配置される。上部プレート3は、木製柱体13の下端に配置される。下部プレート5には、貫通孔が設けられ、複数のアンカーボルト9が、それぞれの貫通孔に挿通されて、ナットによって下部プレート5に固定される。下部プレート5とコンクリート19との間には、モルタル7が充填される。アンカーボルト9は、基礎であるコンクリート19に固定される。【選択図】図1
COLUMN BASE STRUCTURE AND METHOD FOR CONSTRUCTING COLUMN BASE STRUCTURE
PROBLEM TO BE SOLVED: To provide a column base structure and the like comprising a wooden column body excellent in construction workability.SOLUTION: A column base hardware 21 is formed by connecting an upper plate 3 to a lower plate 5 with a steel pipe 15. The upper plate 3 and the lower plate 5 are arranged generally in parallel to each other. The upper plate 3 is positioned at a bottom edge of a wooden column body 13. The lower plate 5 is provided with a plurality of through holes through which a plurality of anchor bolts 9 are respectively inserted and are respectively fastened to the lower plate 5 with nuts. Cement mortar 7 is charged into a gap between the lower plate 5 and concrete 19. The anchor bolt 9 is fastened to the concrete 19 as the foundation.SELECTED DRAWING: Figure 1
【課題】 施工作業性に優れた木製柱体の柱脚構造等を提供する。【解決手段】 柱脚金物21は、上部プレート3と下部プレート5とが鋼管15を介して接合されて形成される。上部プレート3と下部プレート5は、互いに略平行に配置される。上部プレート3は、木製柱体13の下端に配置される。下部プレート5には、貫通孔が設けられ、複数のアンカーボルト9が、それぞれの貫通孔に挿通されて、ナットによって下部プレート5に固定される。下部プレート5とコンクリート19との間には、モルタル7が充填される。アンカーボルト9は、基礎であるコンクリート19に固定される。【選択図】図1
COLUMN BASE STRUCTURE AND METHOD FOR CONSTRUCTING COLUMN BASE STRUCTURE
柱脚構造、柱脚構造の施工方法
ITO MICHIO (author) / FUJITA TOMOKO (author)
2018-06-14
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2019
|