A platform for research: civil engineering, architecture and urbanism
CEILING HANGING BRACKET AND SKELETON STRUCTURE OF MULTI-TIERED BUILDING
PROBLEM TO BE SOLVED: To provide a ceiling hanging bracket with reduced difficulty of fitting to a beam and a ceiling joist.SOLUTION: An intermediate ceiling hanging bracket 23 of a skeleton structure comprises a main body 38, a beam screw hole 39 that is screwed into the beam screw hole 39 and cooperates with a fixing groove 47 to fix a flange of an H beam or a C beam to the main body 38, a ceiling joist screw 40 screwed into a ceiling joist hole 46, and four ceiling joist nuts 41, 42 which are screwed into the ceiling joist screw 40 and cooperate with the ceiling joist screw 40 to fix a ceiling joist to the main body 38, the fixing groove 47 comprises a horizontal groove 48 extending in a first horizontal direction 8 and opening to the outside of a vertical portion 44 in one direction 8A in the first horizontal direction 8 and a vertical groove 49 opening in the horizontal groove 48 and extending in the vertical direction 7, and a beam screw hole 45 is located at a position overlapping with the fixing groove 47 in the first horizontal direction 8, and the ceiling joist hole 46 is located at a position away from the fixing groove 47 in the first horizontal direction 8 in the other direction 8B in the first horizontal direction 8.SELECTED DRAWING: Figure 4
【課題】梁及び野縁受への取付作業が困難になることを防止できる天井吊り金具を提供する。【解決手段】躯体構造の中間天井吊り金具23は、本体38と、梁ネジ孔39に螺合し且つ固定溝47と協働して本体38にH形梁のフランジ又はC形梁のフランジを固定する梁ネジ39と、野縁受孔46に螺合する野縁受ネジ40と、野縁受ネジ40に螺合し且つ野縁受ネジ40と協働して本体38に野縁受を固定する4つの野縁受ナット41、42と、を備え、固定溝47は、第1水平方向8に延び且つ第1水平方向8の一方向き8Aに鉛直部44の外部へ開口する水平溝48と、水平溝48に開口し且つ上下方向7に延びる鉛直溝49と、を有し、梁ネジ孔45は、第1水平方向8において固定溝47と重なる位置にあり、野縁受孔46は、第1水平方向8において固定溝47よりも第1水平方向8の他方向き8Bに離れた位置にある。【選択図】図4
CEILING HANGING BRACKET AND SKELETON STRUCTURE OF MULTI-TIERED BUILDING
PROBLEM TO BE SOLVED: To provide a ceiling hanging bracket with reduced difficulty of fitting to a beam and a ceiling joist.SOLUTION: An intermediate ceiling hanging bracket 23 of a skeleton structure comprises a main body 38, a beam screw hole 39 that is screwed into the beam screw hole 39 and cooperates with a fixing groove 47 to fix a flange of an H beam or a C beam to the main body 38, a ceiling joist screw 40 screwed into a ceiling joist hole 46, and four ceiling joist nuts 41, 42 which are screwed into the ceiling joist screw 40 and cooperate with the ceiling joist screw 40 to fix a ceiling joist to the main body 38, the fixing groove 47 comprises a horizontal groove 48 extending in a first horizontal direction 8 and opening to the outside of a vertical portion 44 in one direction 8A in the first horizontal direction 8 and a vertical groove 49 opening in the horizontal groove 48 and extending in the vertical direction 7, and a beam screw hole 45 is located at a position overlapping with the fixing groove 47 in the first horizontal direction 8, and the ceiling joist hole 46 is located at a position away from the fixing groove 47 in the first horizontal direction 8 in the other direction 8B in the first horizontal direction 8.SELECTED DRAWING: Figure 4
【課題】梁及び野縁受への取付作業が困難になることを防止できる天井吊り金具を提供する。【解決手段】躯体構造の中間天井吊り金具23は、本体38と、梁ネジ孔39に螺合し且つ固定溝47と協働して本体38にH形梁のフランジ又はC形梁のフランジを固定する梁ネジ39と、野縁受孔46に螺合する野縁受ネジ40と、野縁受ネジ40に螺合し且つ野縁受ネジ40と協働して本体38に野縁受を固定する4つの野縁受ナット41、42と、を備え、固定溝47は、第1水平方向8に延び且つ第1水平方向8の一方向き8Aに鉛直部44の外部へ開口する水平溝48と、水平溝48に開口し且つ上下方向7に延びる鉛直溝49と、を有し、梁ネジ孔45は、第1水平方向8において固定溝47と重なる位置にあり、野縁受孔46は、第1水平方向8において固定溝47よりも第1水平方向8の他方向き8Bに離れた位置にある。【選択図】図4
CEILING HANGING BRACKET AND SKELETON STRUCTURE OF MULTI-TIERED BUILDING
天井吊り金具及び多階層建物の躯体構造
TO MASAAKI (author) / ISHII TAKANOBU (author) / FUJISAWA KENICHI (author) / TSUJI KAZUKI (author)
2018-08-02
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method of hanging bracket structure system of building suspended ceiling
European Patent Office | 2022
|SUSPENDED CEILING STRUCTURE AND HANGING MEMBER CONNECTING BRACKET
European Patent Office | 2018
|European Patent Office | 2018
|