A platform for research: civil engineering, architecture and urbanism
BAINITE RAIL SHELLING PREVENTION SYSTEM AND METHOD
PROBLEM TO BE SOLVED: To be able to easily and accurately select in a short amount of time a location to perform corrective grinding to prevent the shelling of a bainite rail.SOLUTION: A system comprises: a shelling database which stores relation between minute fissures generated in a bainite rail on which a white layer has been formed and tonnage that has passed through; and a corrective grinding location selection part which selects a bainite rail location as a corrective grinding object in order to prevent shelling. The corrective grinding location selection part, based on data acquired from the shelling database, selects as the corrective grinding object a location on the bainite rail where shelling has not occurred yet and at which there is a high probability of shelling occurrence.SELECTED DRAWING: Figure 1
【課題】ベイナイトレールのシェリングを予防するために行う削正箇所を短時間で容易に、かつ、正確に選定することができるようにする。【解決手段】白色層が形成されたベイナイトレールに発生する微小亀裂と通過トン数との関係を格納するシェリングデータベースと、シェリングの発生を予防するために削正の対象となるベイナイトレールの箇所を選定する削正箇所選定部とを備え、該削正箇所選定部は、前記シェリングデータベースから取得したデータに基づき、ベイナイトレールにおいてシェリングが未発生であって、かつ、シェリングの発生の可能性が高い箇所を前記削正の対象として選定する。【選択図】図1
BAINITE RAIL SHELLING PREVENTION SYSTEM AND METHOD
PROBLEM TO BE SOLVED: To be able to easily and accurately select in a short amount of time a location to perform corrective grinding to prevent the shelling of a bainite rail.SOLUTION: A system comprises: a shelling database which stores relation between minute fissures generated in a bainite rail on which a white layer has been formed and tonnage that has passed through; and a corrective grinding location selection part which selects a bainite rail location as a corrective grinding object in order to prevent shelling. The corrective grinding location selection part, based on data acquired from the shelling database, selects as the corrective grinding object a location on the bainite rail where shelling has not occurred yet and at which there is a high probability of shelling occurrence.SELECTED DRAWING: Figure 1
【課題】ベイナイトレールのシェリングを予防するために行う削正箇所を短時間で容易に、かつ、正確に選定することができるようにする。【解決手段】白色層が形成されたベイナイトレールに発生する微小亀裂と通過トン数との関係を格納するシェリングデータベースと、シェリングの発生を予防するために削正の対象となるベイナイトレールの箇所を選定する削正箇所選定部とを備え、該削正箇所選定部は、前記シェリングデータベースから取得したデータに基づき、ベイナイトレールにおいてシェリングが未発生であって、かつ、シェリングの発生の可能性が高い箇所を前記削正の対象として選定する。【選択図】図1
BAINITE RAIL SHELLING PREVENTION SYSTEM AND METHOD
ベイナイトレールのシェリング予防システム及び方法
TSUJIE MASAHIRO (author)
2018-08-23
Patent
Electronic Resource
Japanese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Online Contents | 1997
High-toughness bainite steel rail and production method thereof
European Patent Office | 2022
|Averaged shelling for quasicrystals
British Library Online Contents | 2000
|British Library Online Contents | 1997