FIXTURE FOR JOINING COLUMN AND BEAM TOGETHER
PROBLEM TO BE SOLVED: To provide a joint fixture appropriate for a structure for joining a column and a beam together, which dispenses with a support member for supporting a beam end and which enables a precast concrete member to be simply connected onto the beam.SOLUTION: A fixture (5) for joining a column and a beam together is a fixture for joining a column (11) that has a top surface provided with first and second bars (15) and (16) protruding upward, a first beam (13) that has a through-hole (19) at one end and that has the one end placed on the top surface of the column, and a second beam (14) that has a through-hole (20) at one end and that has the one end placed on the top surface of the column. The fixture comprises a positioning member (90) that is arranged astride the first and second beams. The positioning member (90) has a first hole (91) that receives the first bar (15) protruding from one end of the first beam, and a second hole (92) that is arranged away by a predetermined distance from the first hole and that receives the second bar (16) protruding from the one end of the second beam.SELECTED DRAWING: Figure 15
【課題】梁端部を支持するサポート部材を不要とし、かつ、梁の上に簡易にプレキャストコンクリート部材を接続することのできる、柱と梁との接合構造に適した接合用治具を提供する。【解決手段】柱と梁との接合用治具(5)は、上方に突出する第1の棒材(15)および第2の棒材(16)を上面に有する柱(11)と、貫通孔(19)を一方端部に有し、該一方端部が柱の上面に載置される第1の梁(13)と、貫通孔(20)を一方端部に有し、該一方端部が柱の上面に載置される第2の梁(14)との接合用治具であって、第1の梁および第2の梁に跨って配置される位置決め部材(90)を備える。位置決め部材(90)は、第1の梁の一方端部から突出する第1の棒材(15)を受入れる第1の孔(91)と、第1の孔から所定の距離だけ離れて配置され、第2の梁の一方端部から突出する第2の棒材(16)を受入れる第2の孔(92)とを有する。【選択図】図15
FIXTURE FOR JOINING COLUMN AND BEAM TOGETHER
PROBLEM TO BE SOLVED: To provide a joint fixture appropriate for a structure for joining a column and a beam together, which dispenses with a support member for supporting a beam end and which enables a precast concrete member to be simply connected onto the beam.SOLUTION: A fixture (5) for joining a column and a beam together is a fixture for joining a column (11) that has a top surface provided with first and second bars (15) and (16) protruding upward, a first beam (13) that has a through-hole (19) at one end and that has the one end placed on the top surface of the column, and a second beam (14) that has a through-hole (20) at one end and that has the one end placed on the top surface of the column. The fixture comprises a positioning member (90) that is arranged astride the first and second beams. The positioning member (90) has a first hole (91) that receives the first bar (15) protruding from one end of the first beam, and a second hole (92) that is arranged away by a predetermined distance from the first hole and that receives the second bar (16) protruding from the one end of the second beam.SELECTED DRAWING: Figure 15
【課題】梁端部を支持するサポート部材を不要とし、かつ、梁の上に簡易にプレキャストコンクリート部材を接続することのできる、柱と梁との接合構造に適した接合用治具を提供する。【解決手段】柱と梁との接合用治具(5)は、上方に突出する第1の棒材(15)および第2の棒材(16)を上面に有する柱(11)と、貫通孔(19)を一方端部に有し、該一方端部が柱の上面に載置される第1の梁(13)と、貫通孔(20)を一方端部に有し、該一方端部が柱の上面に載置される第2の梁(14)との接合用治具であって、第1の梁および第2の梁に跨って配置される位置決め部材(90)を備える。位置決め部材(90)は、第1の梁の一方端部から突出する第1の棒材(15)を受入れる第1の孔(91)と、第1の孔から所定の距離だけ離れて配置され、第2の梁の一方端部から突出する第2の棒材(16)を受入れる第2の孔(92)とを有する。【選択図】図15
FIXTURE FOR JOINING COLUMN AND BEAM TOGETHER
柱と梁との接合用治具
DONG DEJING (author) / FUJITA KOHEI (author) / KAMIBAYASHI TADASHI (author) / SUZUKI KINYA (author)
2018-09-20
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
STRUCTURE AND METHOD FOR JOINING COLUMN AND BEAM TOGETHER
European Patent Office | 2018
|COLUMN BEAM JOINING STRUCTURE AND COLUMN BEAM JOINING METHOD
European Patent Office | 2017
|COLUMN BEAM JOINING STRUCTURE AND COLUMN BEAM JOINING METHOD
European Patent Office | 2017
|COLUMN BEAM JOINING STRUCTURE AND COLUMN BEAM JOINING METHOD
European Patent Office | 2017
|STRUCTURE FOR JOINING STEEL COLUMN AND REINFORCED CONCRETE BEAM TOGETHER
European Patent Office | 2016
|