PROBLEM TO BE SOLVED: To provide a filling method to properly fill an underground cavity while comprehending a condition of the underground cavity.SOLUTION: A filling method of an underground cavity comprises: a process to form a borehole penetrating to the underground cavity from the surface; a process to pour water into the underground cavity through the borehole; a process to pour cement paste into the underground cavity through the borehole when a water pressure, which is measured after poured water reaches a predetermined amount, is equal to or lower than a first threshold; and a process to pour mortar slurry into the underground cavity through the borehole when the pressure, which is measured after poured cement paste reaches a predetermined amount, is equal to or lower than a second threshold.SELECTED DRAWING: Figure 6
【課題】地下空洞部の状態を把握して地下空洞部内を適切に充填する。【解決手段】地下空洞部の充填方法は、地下空洞部に通ずるボーリング孔を地表から形成する工程と、ボーリング孔を通じて地下空洞部内に注水する工程と、所定量の水が注水されたときの水圧を測定し、測定された水圧の大きさが第1の閾値以下である場合、ボーリング孔を通じて地下空洞部内にセメントペーストを注入する工程と、所定量のセメントペーストが注入されたときの圧力を測定し、測定された圧力の大きさが第2の閾値以下である場合、ボーリング孔を通じて地下空洞部内にモルタルスラリーを注入する工程とを含む。【選択図】図6
PROBLEM TO BE SOLVED: To provide a filling method to properly fill an underground cavity while comprehending a condition of the underground cavity.SOLUTION: A filling method of an underground cavity comprises: a process to form a borehole penetrating to the underground cavity from the surface; a process to pour water into the underground cavity through the borehole; a process to pour cement paste into the underground cavity through the borehole when a water pressure, which is measured after poured water reaches a predetermined amount, is equal to or lower than a first threshold; and a process to pour mortar slurry into the underground cavity through the borehole when the pressure, which is measured after poured cement paste reaches a predetermined amount, is equal to or lower than a second threshold.SELECTED DRAWING: Figure 6
【課題】地下空洞部の状態を把握して地下空洞部内を適切に充填する。【解決手段】地下空洞部の充填方法は、地下空洞部に通ずるボーリング孔を地表から形成する工程と、ボーリング孔を通じて地下空洞部内に注水する工程と、所定量の水が注水されたときの水圧を測定し、測定された水圧の大きさが第1の閾値以下である場合、ボーリング孔を通じて地下空洞部内にセメントペーストを注入する工程と、所定量のセメントペーストが注入されたときの圧力を測定し、測定された圧力の大きさが第2の閾値以下である場合、ボーリング孔を通じて地下空洞部内にモルタルスラリーを注入する工程とを含む。【選択図】図6
FILLING METHOD OF UNDERGROUND CAVITY
地下空洞部の充填方法
FUJITA TETSUO (author)
2018-10-18
Patent
Electronic Resource
Japanese