A platform for research: civil engineering, architecture and urbanism
METHOD OF CONSTRUCTING FLOOR TILE
PROBLEM TO BE SOLVED: To provide a method of constructing a floor tile allowing confirmation of a filling property of a rear surface in an effective and reliable manner and also preferable construction even for a large floor tile.SOLUTION: There is provided a method of sticking a floor tile 1 by an adhesive material 3 on a surface of an adhesion target 2, in which a damming part 6 is interposed between the surface of the adhesion target 2 and an outer periphery-end side of the floor tile 1, the floor tile 1 is arranged on the surface of the adhesion target 2, filling space is formed between the surface of the adhesion target 2 and the rear surface of the floor tile 1 by the damming part 6, an injection port H1 and a plurality of blowing ports H2, H3, H4 for communicating the filling space with the outside are formed, the adhesive material 3 is injected from the injection port H1 into the filling space, and the injection is completed when the adhesive material 3 flows out of the plurality of blowing ports H2, H3, H4.SELECTED DRAWING: Figure 1
【課題】大型の床タイルであっても、効率的且つ確実に、裏面の充填性を確認できるとともに好適に施工を行うことを可能にする床タイルの施工方法を提供する。【解決手段】貼付け対象2の表面に貼付け用材3を介して床タイル1を貼設する方法であって、貼付け対象2の表面と床タイル1の外周端部側の間に堰き止め部6を介在させつつ貼付け対象2の表面上に床タイル1を配設し、且つ堰き止め部6によって貼付け対象2の表面と床タイル1の裏面との間に充填空間を形成するとともに、充填空間と外部を連通させる注入口H1及び複数の吹出口H2、H3、H4を形成し、注入口H1から貼付け用材3を充填空間に注入し、複数の吹出口H2、H3、H4から貼付け用材3が流出した段階で注入を完了する。【選択図】図1
METHOD OF CONSTRUCTING FLOOR TILE
PROBLEM TO BE SOLVED: To provide a method of constructing a floor tile allowing confirmation of a filling property of a rear surface in an effective and reliable manner and also preferable construction even for a large floor tile.SOLUTION: There is provided a method of sticking a floor tile 1 by an adhesive material 3 on a surface of an adhesion target 2, in which a damming part 6 is interposed between the surface of the adhesion target 2 and an outer periphery-end side of the floor tile 1, the floor tile 1 is arranged on the surface of the adhesion target 2, filling space is formed between the surface of the adhesion target 2 and the rear surface of the floor tile 1 by the damming part 6, an injection port H1 and a plurality of blowing ports H2, H3, H4 for communicating the filling space with the outside are formed, the adhesive material 3 is injected from the injection port H1 into the filling space, and the injection is completed when the adhesive material 3 flows out of the plurality of blowing ports H2, H3, H4.SELECTED DRAWING: Figure 1
【課題】大型の床タイルであっても、効率的且つ確実に、裏面の充填性を確認できるとともに好適に施工を行うことを可能にする床タイルの施工方法を提供する。【解決手段】貼付け対象2の表面に貼付け用材3を介して床タイル1を貼設する方法であって、貼付け対象2の表面と床タイル1の外周端部側の間に堰き止め部6を介在させつつ貼付け対象2の表面上に床タイル1を配設し、且つ堰き止め部6によって貼付け対象2の表面と床タイル1の裏面との間に充填空間を形成するとともに、充填空間と外部を連通させる注入口H1及び複数の吹出口H2、H3、H4を形成し、注入口H1から貼付け用材3を充填空間に注入し、複数の吹出口H2、H3、H4から貼付け用材3が流出した段階で注入を完了する。【選択図】図1
METHOD OF CONSTRUCTING FLOOR TILE
床タイルの施工方法
FUNAKOSHI KIE (author) / NACHI HIROSHI (author)
2018-10-18
Patent
Electronic Resource
Japanese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
EMBOSSING METHOD FOR FLOOR TILE AND THERMOPLASTIC FLOOR TILE
European Patent Office | 2025
|FLOOR TILE ADHESION MORTAR AND FLOOR TILE ADHESION METHOD
European Patent Office | 2023
|