A platform for research: civil engineering, architecture and urbanism
WALL SURFACE STRUCTURE AND WALL SURFACE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a wall surface structure, which enables components of a retaining wall to be easily repaired and can be used for general purpose, and a construction method to acquire the same.SOLUTION: A brace 1 with substantially H-shaped cross section has flange parts (projection pieces) 11, 12, which face each other between adjacent braces. A wall panel 2 comprises: a panel body 21 on which butting regions 20a, 20b that simultaneously butt against the projection pieces of both adjacent braces are formed in the vicinity of both side end parts; and pinching members 22, 23, which are long enough to reach both projection pieces of the adjacent braces on a rear side of the surface of projection pieces against which the butting regions butt. The projection piece is pinched by connecting both pinching members. A construction method comprises: a brace erection process to erect predetermined pieces of braces at appropriate interval so that front face of the flange part is in parallel with wall surface direction; and a wall panel construction process to pinch the flange by making vicinity of both ends of the panel body butt against front face side of the flange part of one of two adjacent braces and connecting the pinching member on the rear face side.SELECTED DRAWING: Figure 1
【課題】 擁壁の構成要素の補修を容易にするとともに、汎用性ある壁面構造体を提供することと、そのための構築方法を提供する。【解決手段】 断面略H形状の支柱1には、隣接する支柱の相互間に対向するフランジ部(突片)11,12を備え、壁パネル2には、隣接する前記支柱の双方における突片に同時に当接する当接領域20a,20bを両側端部近傍に形成されるパネル本体21と、当接領域が当接する突片の表面の背面側において隣接する支柱の双方の突片に到達する長さを有する挟持部材22,23とを備え、両者を連結させることにより突片を挟持する。支柱をフランジ部の正面が壁面方向に平行となる状態として、所定本数を適宜間隔で立設する支柱立設工程と、隣接する二つの支柱の一方のフランジ部の正面側にパネル本体の両端近傍を当接させ、背面側に挟持部材を連結させてフランジを挟持する壁パネル構築工程とを含む。【選択図】 図1
WALL SURFACE STRUCTURE AND WALL SURFACE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a wall surface structure, which enables components of a retaining wall to be easily repaired and can be used for general purpose, and a construction method to acquire the same.SOLUTION: A brace 1 with substantially H-shaped cross section has flange parts (projection pieces) 11, 12, which face each other between adjacent braces. A wall panel 2 comprises: a panel body 21 on which butting regions 20a, 20b that simultaneously butt against the projection pieces of both adjacent braces are formed in the vicinity of both side end parts; and pinching members 22, 23, which are long enough to reach both projection pieces of the adjacent braces on a rear side of the surface of projection pieces against which the butting regions butt. The projection piece is pinched by connecting both pinching members. A construction method comprises: a brace erection process to erect predetermined pieces of braces at appropriate interval so that front face of the flange part is in parallel with wall surface direction; and a wall panel construction process to pinch the flange by making vicinity of both ends of the panel body butt against front face side of the flange part of one of two adjacent braces and connecting the pinching member on the rear face side.SELECTED DRAWING: Figure 1
【課題】 擁壁の構成要素の補修を容易にするとともに、汎用性ある壁面構造体を提供することと、そのための構築方法を提供する。【解決手段】 断面略H形状の支柱1には、隣接する支柱の相互間に対向するフランジ部(突片)11,12を備え、壁パネル2には、隣接する前記支柱の双方における突片に同時に当接する当接領域20a,20bを両側端部近傍に形成されるパネル本体21と、当接領域が当接する突片の表面の背面側において隣接する支柱の双方の突片に到達する長さを有する挟持部材22,23とを備え、両者を連結させることにより突片を挟持する。支柱をフランジ部の正面が壁面方向に平行となる状態として、所定本数を適宜間隔で立設する支柱立設工程と、隣接する二つの支柱の一方のフランジ部の正面側にパネル本体の両端近傍を当接させ、背面側に挟持部材を連結させてフランジを挟持する壁パネル構築工程とを含む。【選択図】 図1
WALL SURFACE STRUCTURE AND WALL SURFACE CONSTRUCTION METHOD
壁面構造体および壁面構築方法
MIURA KINYA (author) / KURITA KAZUHIRO (author) / KONAMI TAKEJI (author)
2018-11-15
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Wall surface construction method and wall surface structure
European Patent Office | 2015
|WALL SURFACE CONSTRUCTION METHOD AND WALL SURFACE STRUCTURE
European Patent Office | 2020
|WALL SURFACE STRUCTURE AND CONSTRUCTION METHOD OF WALL SURFACE STRUCTURE
European Patent Office | 2022
|WALL SURFACE CONSTRUCTION DEVICE, AND WALL SURFACE CONSTRUCTION METHOD
European Patent Office | 2024
|