A platform for research: civil engineering, architecture and urbanism
DATABASE CONSTRUCTION METHOD
To provide a method with which it is possible to construct, using few measured data, a database with high accuracy that can respond to a combination of various conditions.SOLUTION: Provided is a database construction method including the steps of: previously determining three or more numeric values for each of independent variable data A and independent variable data B and obtaining the measured value of dependent variable data that is determined by the independent variable data; calculating, for the previously determined numeric value of one of the independent variable data, the predicted value of dependent variable data using the other of the independent variable data and a relational expression obtained from the measured value, and obtaining a plurality of set data that includes the one of the independent variable data, the other of the independent variable data and the predicated value of the dependent variable data; calculating, for a discretionarily determined numeric value of the other of the independent variable data, the predicted value of the dependent variable data using the one of the independent variable data and a relational expression obtained from the predicated value obtained in the preceding step, and obtaining a plurality of set data that includes the one of the independent variable data, the other of the independent variable data and the predicted value of the dependent variable data.SELECTED DRAWING: Figure 1
【課題】少数の実測データを用いて、様々な条件の組み合わせに対応可能なデータベースを高い精度で構築することができる方法を提供する。【解決手段】独立変数データA及び独立変数データBの各々について3つ以上の数値を予め定め、独立変数データによって定まる従属変数データの実測値を得る工程と、一方の独立変数データの予め定めた数値について、他方の独立変数データと実測値から得られた関係式を用いて、従属変数データの予測値を算出して、一方の独立変数データ、他方の独立変数データ及び従属変数データの予測値を含む組データを複数得る工程と、他方の独立変数データの任意に定めた数値について、一方の独立変数データと前工程で得られた予測値から得られた関係式を用いて、従属変数データの予測値を算出して、一方の独立変数データ、他方の独立変数データ及び従属変数データの予測値を含む組データを複数得る工程を含むデータベースの構築方法。【選択図】図1
DATABASE CONSTRUCTION METHOD
To provide a method with which it is possible to construct, using few measured data, a database with high accuracy that can respond to a combination of various conditions.SOLUTION: Provided is a database construction method including the steps of: previously determining three or more numeric values for each of independent variable data A and independent variable data B and obtaining the measured value of dependent variable data that is determined by the independent variable data; calculating, for the previously determined numeric value of one of the independent variable data, the predicted value of dependent variable data using the other of the independent variable data and a relational expression obtained from the measured value, and obtaining a plurality of set data that includes the one of the independent variable data, the other of the independent variable data and the predicated value of the dependent variable data; calculating, for a discretionarily determined numeric value of the other of the independent variable data, the predicted value of the dependent variable data using the one of the independent variable data and a relational expression obtained from the predicated value obtained in the preceding step, and obtaining a plurality of set data that includes the one of the independent variable data, the other of the independent variable data and the predicted value of the dependent variable data.SELECTED DRAWING: Figure 1
【課題】少数の実測データを用いて、様々な条件の組み合わせに対応可能なデータベースを高い精度で構築することができる方法を提供する。【解決手段】独立変数データA及び独立変数データBの各々について3つ以上の数値を予め定め、独立変数データによって定まる従属変数データの実測値を得る工程と、一方の独立変数データの予め定めた数値について、他方の独立変数データと実測値から得られた関係式を用いて、従属変数データの予測値を算出して、一方の独立変数データ、他方の独立変数データ及び従属変数データの予測値を含む組データを複数得る工程と、他方の独立変数データの任意に定めた数値について、一方の独立変数データと前工程で得られた予測値から得られた関係式を用いて、従属変数データの予測値を算出して、一方の独立変数データ、他方の独立変数データ及び従属変数データの予測値を含む組データを複数得る工程を含むデータベースの構築方法。【選択図】図1
DATABASE CONSTRUCTION METHOD
データベースの構築方法
SUEMATSU RYOICHI (author) / KUGA RYUICHIRO (author) / KUROKAWA DAISUKE (author) / HIRAO HIROSHI (author)
2018-12-27
Patent
Electronic Resource
Japanese
CRISP construction research database
Emerald Group Publishing | 1998
Construction of a Glaze Database
British Library Online Contents | 2014
|Construction Automation Research Database (CARD)
British Library Conference Proceedings | 1994
|Med-Database: a design framework of construction mediation case database system
British Library Conference Proceedings | 2003
|Database approach for construction data management
British Library Conference Proceedings | 2001
|