A platform for research: civil engineering, architecture and urbanism
COMPACTION METHOD AND COMPACTION MANAGEMENT SYSTEM
To accurately grasp compaction state in a compaction construction region.SOLUTION: A compaction management system 1 comprises: a rigidity measuring portion 6a measuring rigidity of a compaction construction region G; a data generating portion 6b generating data indicating a relationship between a compaction number in the compaction construction region G and measured values of rigidity in the compaction construction region G; a rigidity reduction determination portion 6d determining whether the rigidity in the compaction construction region G is reduced according to increase in the number of times of compaction in the compaction construction region G on the basis of the data; and a display portion 8 displaying a determination result in the rigidity reduction determination portion 6d.SELECTED DRAWING: Figure 6
【課題】締固め施工領域の締固め状態を正確に把握する。【解決手段】締固め管理システム1は、締固め施工領域Gの剛性を測定する剛性測定部6aと、締固め施工領域Gでの締固め回数と締固め施工領域Gの剛性の測定値との関係を示すデータを作成するデータ作成部6bと、該データに基づいて、締固め施工領域Gでの締固め回数の増加に伴って締固め施工領域Gの剛性が低下しているか否かを判定する剛性低下判定部6dと、剛性低下判定部6dでの判定結果を表示する表示部8とを有する。【選択図】図6
COMPACTION METHOD AND COMPACTION MANAGEMENT SYSTEM
To accurately grasp compaction state in a compaction construction region.SOLUTION: A compaction management system 1 comprises: a rigidity measuring portion 6a measuring rigidity of a compaction construction region G; a data generating portion 6b generating data indicating a relationship between a compaction number in the compaction construction region G and measured values of rigidity in the compaction construction region G; a rigidity reduction determination portion 6d determining whether the rigidity in the compaction construction region G is reduced according to increase in the number of times of compaction in the compaction construction region G on the basis of the data; and a display portion 8 displaying a determination result in the rigidity reduction determination portion 6d.SELECTED DRAWING: Figure 6
【課題】締固め施工領域の締固め状態を正確に把握する。【解決手段】締固め管理システム1は、締固め施工領域Gの剛性を測定する剛性測定部6aと、締固め施工領域Gでの締固め回数と締固め施工領域Gの剛性の測定値との関係を示すデータを作成するデータ作成部6bと、該データに基づいて、締固め施工領域Gでの締固め回数の増加に伴って締固め施工領域Gの剛性が低下しているか否かを判定する剛性低下判定部6dと、剛性低下判定部6dでの判定結果を表示する表示部8とを有する。【選択図】図6
COMPACTION METHOD AND COMPACTION MANAGEMENT SYSTEM
締固め方法、及び、締固め管理システム
TSUJI RYOSUKE (author) / YOSHIDA TERU (author) / FUJISAKI KATSUTOSHI (author) / KOBAYASHI HIROAKI (author) / OBARA TAKASHI (author)
2019-01-10
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
COMPACTION MANAGEMENT METHOD, AND COMPACTION MANAGEMENT SYSTEM
European Patent Office | 2020
|European Patent Office | 2023
|CONCRETE COMPACTION MANAGEMENT SYSTEM, AND CONCRETE COMPACTION MANAGEMENT METHOD
European Patent Office | 2023
|CONCRETE COMPACTION MANAGEMENT SYSTEM AND CONCRETE COMPACTION MANAGEMENT METHOD
European Patent Office | 2016
|CONCRETE COMPACTION MANAGEMENT SYSTEM AND CONCRETE COMPACTION MANAGEMENT METHOD
European Patent Office | 2024
|