INVERT PIER AND TUNNEL INVERT CONSTRUCTION METHOD
To provide invert pier and tunnel invert construction method capable of invert drilling without moving a pier after completion of invert concrete casting.SOLUTION: The invert pier comprises a work platform 10 having a casting space below for casting invert concrete, a front oblique path 20 stretched between a front end of the work platform 10 and the ground, a rear oblique path 30 stretched between a rear end of the work platform 10 and the ground, and a plurality of support legs 40 attached to a lower portion of the work platform 10 to support the work platform 10 away from the ground. The width of the front oblique path 20 is equal to or less than half the width of the work platform 10, the front oblique path 20 can be connected to an arbitrary position in the width direction of the work platform 10, and the front oblique path 20 can be divided in the width direction into the first front oblique path and the second front oblique path.SELECTED DRAWING: Figure 1
【課題】インバートコンクリート打設の完了後に、桟橋を移動することなくインバート掘削が可能な、インバート桟橋およびトンネルインバート施工方法を提供する。【解決手段】下方にインバートコンクリート打設作業用の打設空間を有する作業架台10と、作業架台10の前端と地盤との間に掛け渡す前部斜路20と、作業架台10の後端と地盤との間に掛け渡す後部斜路30と、作業架台10の下部に付設し、作業架台10を地盤から離間支持する複数の支持脚40と、を備え、前部斜路20の幅は、作業架台10の幅の半分以下であり、前部斜路20が、作業架台10の幅方向における任意の位置に接続可能であり、前部斜路20が、第一前部斜路と第二前部斜路とに、幅方向に分割可能であることを特徴とする。【選択図】図1
INVERT PIER AND TUNNEL INVERT CONSTRUCTION METHOD
To provide invert pier and tunnel invert construction method capable of invert drilling without moving a pier after completion of invert concrete casting.SOLUTION: The invert pier comprises a work platform 10 having a casting space below for casting invert concrete, a front oblique path 20 stretched between a front end of the work platform 10 and the ground, a rear oblique path 30 stretched between a rear end of the work platform 10 and the ground, and a plurality of support legs 40 attached to a lower portion of the work platform 10 to support the work platform 10 away from the ground. The width of the front oblique path 20 is equal to or less than half the width of the work platform 10, the front oblique path 20 can be connected to an arbitrary position in the width direction of the work platform 10, and the front oblique path 20 can be divided in the width direction into the first front oblique path and the second front oblique path.SELECTED DRAWING: Figure 1
【課題】インバートコンクリート打設の完了後に、桟橋を移動することなくインバート掘削が可能な、インバート桟橋およびトンネルインバート施工方法を提供する。【解決手段】下方にインバートコンクリート打設作業用の打設空間を有する作業架台10と、作業架台10の前端と地盤との間に掛け渡す前部斜路20と、作業架台10の後端と地盤との間に掛け渡す後部斜路30と、作業架台10の下部に付設し、作業架台10を地盤から離間支持する複数の支持脚40と、を備え、前部斜路20の幅は、作業架台10の幅の半分以下であり、前部斜路20が、作業架台10の幅方向における任意の位置に接続可能であり、前部斜路20が、第一前部斜路と第二前部斜路とに、幅方向に分割可能であることを特徴とする。【選択図】図1
INVERT PIER AND TUNNEL INVERT CONSTRUCTION METHOD
インバート桟橋およびトンネルインバート施工方法
UDA MAKOTO (author) / UEMURA YOSHIYUKI (author) / YUFU SOICHIRO (author) / SHIMANE YONEZABURO (author) / KOBAYASHI SATORU (author) / KOBAYASHI MASAHIKO (author)
2019-01-17
Patent
Electronic Resource
Japanese
Invert construction apparatus in a manhole and invert construction method using the same
European Patent Office | 2019
Invert construction apparatus in a manhole and invert construction method using the same
European Patent Office | 2019
|Twin pavers pour tunnel invert blocks
Engineering Index Backfile | 1956
Building invert of Milwaukee intake tunnel
Engineering Index Backfile | 1915
|Tunnel repaired with precast concrete invert beams
Engineering Index Backfile | 1929
|