A platform for research: civil engineering, architecture and urbanism
UNEVEN FORCE CANCELLATION STRUCTURE
To provide an uneven force cancellation for a water pipe bridge in which an uneven force is generated with a simple structure.SOLUTION: It is provided with a water pipe bridge 12 which is formed of a water pipe 16 extended between opposing support parts 50, 60, and a cable 14 installed along the water pipe bridge 12. At least one of the opposing support parts 50, 60 is a structure having at least one of concrete or steel. An end of the water pipe bridge 12 is fixed to the structure 50, and an end of the cable 14 is anchored to the structure 50. The water pipe bridge 12 has a bent part 16A at the end which is fixed to the structure 50 where an uneven force is generated. A tension is introduced into the cable 14 so that the tension of the cable 14 acts on the bent part 16A of the water pipe bridge 12 via the structure 50 to cancel the uneven force.SELECTED DRAWING: Figure 1
【課題】不平均力が発生する水管橋において、単純な構造で不平均力を相殺する。【解決手段】対向する支持部50、60の間に通水管16が架け渡されて形成された水管橋12と、水管橋12に沿って架設されたケーブル14と、を備えてなり、対向する支持部50、60のうちの少なくとも一方は、コンクリートおよび鋼のうちの少なくともいずれか一方を有してなる構造物であり、水管橋12の一端は構造物50に固定されており、かつ、ケーブル14の一端は構造物50に定着されており、水管橋12は、構造物50に固定されている前記一端に、不平均力が発生する屈曲部16Aを有している一方、ケーブル14には張力が導入されていて、ケーブル14の前記張力は構造物50を介して水管橋12の屈曲部16Aに作用して前記不平均力を相殺する。【選択図】図1
UNEVEN FORCE CANCELLATION STRUCTURE
To provide an uneven force cancellation for a water pipe bridge in which an uneven force is generated with a simple structure.SOLUTION: It is provided with a water pipe bridge 12 which is formed of a water pipe 16 extended between opposing support parts 50, 60, and a cable 14 installed along the water pipe bridge 12. At least one of the opposing support parts 50, 60 is a structure having at least one of concrete or steel. An end of the water pipe bridge 12 is fixed to the structure 50, and an end of the cable 14 is anchored to the structure 50. The water pipe bridge 12 has a bent part 16A at the end which is fixed to the structure 50 where an uneven force is generated. A tension is introduced into the cable 14 so that the tension of the cable 14 acts on the bent part 16A of the water pipe bridge 12 via the structure 50 to cancel the uneven force.SELECTED DRAWING: Figure 1
【課題】不平均力が発生する水管橋において、単純な構造で不平均力を相殺する。【解決手段】対向する支持部50、60の間に通水管16が架け渡されて形成された水管橋12と、水管橋12に沿って架設されたケーブル14と、を備えてなり、対向する支持部50、60のうちの少なくとも一方は、コンクリートおよび鋼のうちの少なくともいずれか一方を有してなる構造物であり、水管橋12の一端は構造物50に固定されており、かつ、ケーブル14の一端は構造物50に定着されており、水管橋12は、構造物50に固定されている前記一端に、不平均力が発生する屈曲部16Aを有している一方、ケーブル14には張力が導入されていて、ケーブル14の前記張力は構造物50を介して水管橋12の屈曲部16Aに作用して前記不平均力を相殺する。【選択図】図1
UNEVEN FORCE CANCELLATION STRUCTURE
不平均力相殺構造
TANAKA SHINICHIRO (author)
2019-01-31
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
Construction method of shoulder uneven structure and shoulder uneven structure
European Patent Office | 2020
|UNEVEN ROOF MATERIAL AND CONNECTION STRUCTURE OF UNEVEN ROOF MATERIAL
European Patent Office | 2017
|Capillary Force and Water Retention between Two Uneven-Sized Particles
Online Contents | 2008
|