CONSTRUCTION METHOD OF SRC BEAM AND FORMWORK SUPPORT STRUCTURE OF SRC BEAM
To provide a technique for supporting a formwork reasonably and appropriately while avoiding or reducing the problem of interference with, for example, a shaft brace on a lower surface side of a beam steel frame, when constructing a SRC beam by placing the formwork around the beam steel frame where a beam reinforcements are arranged and placing concrete into the installed framework.SOLUTION: A plurality of receiving members 14 for receiving beam reinforcements 13 above a beam steel frame 11 are arranged in parallel on an upper surface of the beam steel frame 11, and hanging members 20 are attached to both ends of the receiving member 14, and a formwork 40 is suspended and supported on the hanging members 20.SELECTED DRAWING: Figure 2
【課題】梁鉄筋が配筋された梁鉄骨の周囲に型枠を設置し、当該設置した型枠内にコンクリートを打設してSRC梁を構築するにあたり、例えば梁鉄骨の下面側の軸ブレース等との干渉の問題を回避するべく支保工を省略又は削減しながら、型枠を合理的且つ適切に支持することができる技術を提供する。【解決手段】梁鉄筋13を梁鉄骨11の上方で受ける複数の受け部材14を梁鉄骨11の上面に並設すると共に、当該受け部材14の両端に吊部材20を取り付け、当該吊部材20に型枠40を吊下げ支持させる。【選択図】図2
CONSTRUCTION METHOD OF SRC BEAM AND FORMWORK SUPPORT STRUCTURE OF SRC BEAM
To provide a technique for supporting a formwork reasonably and appropriately while avoiding or reducing the problem of interference with, for example, a shaft brace on a lower surface side of a beam steel frame, when constructing a SRC beam by placing the formwork around the beam steel frame where a beam reinforcements are arranged and placing concrete into the installed framework.SOLUTION: A plurality of receiving members 14 for receiving beam reinforcements 13 above a beam steel frame 11 are arranged in parallel on an upper surface of the beam steel frame 11, and hanging members 20 are attached to both ends of the receiving member 14, and a formwork 40 is suspended and supported on the hanging members 20.SELECTED DRAWING: Figure 2
【課題】梁鉄筋が配筋された梁鉄骨の周囲に型枠を設置し、当該設置した型枠内にコンクリートを打設してSRC梁を構築するにあたり、例えば梁鉄骨の下面側の軸ブレース等との干渉の問題を回避するべく支保工を省略又は削減しながら、型枠を合理的且つ適切に支持することができる技術を提供する。【解決手段】梁鉄筋13を梁鉄骨11の上方で受ける複数の受け部材14を梁鉄骨11の上面に並設すると共に、当該受け部材14の両端に吊部材20を取り付け、当該吊部材20に型枠40を吊下げ支持させる。【選択図】図2
CONSTRUCTION METHOD OF SRC BEAM AND FORMWORK SUPPORT STRUCTURE OF SRC BEAM
SRC梁の構築方法及びSRC梁の型枠支持構造