A platform for research: civil engineering, architecture and urbanism
METHOD FOR INJECTING SOLIDIFICATION AGENT INTO EXCAVATION HOLE, AND EXCAVATION ROD
To make it possible to form two types of solidification agent layers with good quality efficiently.SOLUTION: An excavation rod 40 is made by joining an excavation head 30 to the lower end of a rod body 1 in which unit rods 3A, 3B, 3C are connected (Figure a). The unit rod 3B is provided with a closing cylinder 7 that locks on a locking tool 13 to close an upper discharge port 6 of an outer wall and that can slide inside the unit rod 3B (Figures b, c). If the excavation of an excavation hole using the excavation rod 30 is finished, a solidification agent is discharged from a lower discharge port 34 through a liquid passage 2 from above ground, and the excavation rod 40 is raised while forming a first solidification agent layer. Next, a switching top 20 is dropped in the liquid passage 2 from above the rod body 1 (Figure c), a tapered side surface 22 of the switching top 20 releases the locking of the locking tool 13. The switching top 20 and the closing cylinder 7 fall to open the upper discharge port 6. At the same time, since the switching top 20 closes the hollow part of the closing cylinder 7 to block the liquid passage 2 below, a second solidification layer can be formed by discharging a solidification agent from the upper discharge port 6 through the liquid passage 2 from above ground.SELECTED DRAWING: Figure 1
【課題】2種類の良質の固化剤層を効率良く形成できる。【解決手段】単位ロッド3A、3B、3Cをつなげたロッド本体1の下端に、掘削ヘッド30を連結して、掘削ロッド40とする(a)。単位ロッド3Bは、係止具13に係止して外壁の上吐出口6を塞ぎ、かつ単位ロッド3B内を摺動できる閉鎖筒7を設けてある(b、c)。掘削ヘッド30での掘削穴の掘削が完了したならば、地上から液路2を通って下吐出口34から固化剤を吐出させて第1固化剤層を形成しながら掘削ロッド40を上昇させる。次ぎに、ロッド本体1の上方から液路2内に切替駒20を落とすと(c)、切替駒20のテーパー側面22が係止具13の係止を解除する。切替駒20と閉鎖筒7は下降し、上吐出口6を開放する。同時に切替駒20が閉鎖筒7の中空部を塞ぐので下方への液路2を遮断し、地上から液路2を通して上吐出口6から固化剤を吐出させ、第2固化剤層を形成できる。【選択図】図1
METHOD FOR INJECTING SOLIDIFICATION AGENT INTO EXCAVATION HOLE, AND EXCAVATION ROD
To make it possible to form two types of solidification agent layers with good quality efficiently.SOLUTION: An excavation rod 40 is made by joining an excavation head 30 to the lower end of a rod body 1 in which unit rods 3A, 3B, 3C are connected (Figure a). The unit rod 3B is provided with a closing cylinder 7 that locks on a locking tool 13 to close an upper discharge port 6 of an outer wall and that can slide inside the unit rod 3B (Figures b, c). If the excavation of an excavation hole using the excavation rod 30 is finished, a solidification agent is discharged from a lower discharge port 34 through a liquid passage 2 from above ground, and the excavation rod 40 is raised while forming a first solidification agent layer. Next, a switching top 20 is dropped in the liquid passage 2 from above the rod body 1 (Figure c), a tapered side surface 22 of the switching top 20 releases the locking of the locking tool 13. The switching top 20 and the closing cylinder 7 fall to open the upper discharge port 6. At the same time, since the switching top 20 closes the hollow part of the closing cylinder 7 to block the liquid passage 2 below, a second solidification layer can be formed by discharging a solidification agent from the upper discharge port 6 through the liquid passage 2 from above ground.SELECTED DRAWING: Figure 1
【課題】2種類の良質の固化剤層を効率良く形成できる。【解決手段】単位ロッド3A、3B、3Cをつなげたロッド本体1の下端に、掘削ヘッド30を連結して、掘削ロッド40とする(a)。単位ロッド3Bは、係止具13に係止して外壁の上吐出口6を塞ぎ、かつ単位ロッド3B内を摺動できる閉鎖筒7を設けてある(b、c)。掘削ヘッド30での掘削穴の掘削が完了したならば、地上から液路2を通って下吐出口34から固化剤を吐出させて第1固化剤層を形成しながら掘削ロッド40を上昇させる。次ぎに、ロッド本体1の上方から液路2内に切替駒20を落とすと(c)、切替駒20のテーパー側面22が係止具13の係止を解除する。切替駒20と閉鎖筒7は下降し、上吐出口6を開放する。同時に切替駒20が閉鎖筒7の中空部を塞ぐので下方への液路2を遮断し、地上から液路2を通して上吐出口6から固化剤を吐出させ、第2固化剤層を形成できる。【選択図】図1
METHOD FOR INJECTING SOLIDIFICATION AGENT INTO EXCAVATION HOLE, AND EXCAVATION ROD
掘削穴内への固化剤の注入方法および掘削ロッド
KITANI YOSHINOBU (author)
2019-03-22
Patent
Electronic Resource
Japanese
EXCAVATION ROD, EXCAVATION HEAD AND PILE-HOLE EXCAVATION DEVICE
European Patent Office | 2019
|