ROAD BRIDGE INSPECTION DECK AND ROAD BRIDGE INSPECTION DECK CONSTRUCTION METHOD
To provide a permanent road bridge inspection deck having structural stability and a related road bridge inspection deck construction method.SOLUTION: A road bridge inspection deck 100 includes: a plurality of first rails 10, 10 supported by a plurality of bridge piers P1, P2 aligned in the bridge axial direction and attached to a plurality of main girders B1, B1 juxtaposed in a direction perpendicular to the bridge axial direction; and a first movable panel body 40 including a wheel unit 20 consisting of a plurality of wheels 21, 21 capable of traveling on the respective first rails 10, and a scaffold panel 30 supported by the wheel unit 20. Multiple scaffold panels 30 abut each other, and line the axial direction of a bridge below the main girder B1 to cutoff the main girder B1 from a lower space US. The first movable panel body 40A at the end of at least one of the bridge piers P2 is fixed to at least one of the first rails 10, the main girder B1, or a cross girder B2 connected to the main girder B1.SELECTED DRAWING: Figure 3
【課題】構造安定性のある常設の道路橋点検デッキと、係る道路橋点検デッキの施工方法を提供すること。【解決手段】橋軸方向に並ぶ複数の橋脚P1,P2で支持されるとともに、橋軸直角方向に併設される複数の主桁B1,B1に取り付けられている複数の第一レール10,10と、それぞれの第一レール10を走行自在な複数の車輪21,21からなる車輪ユニット20と、車輪ユニット20にて支持される足場パネル30と、を備える第一移動式パネル体40と、を有した道路橋点検デッキ100であり、複数の足場パネル30が相互に当接し、主桁B1の下方において橋軸方向に並んで主桁B1を下方空間USから遮断し、少なくとも一方の橋脚P2側端部にある第一移動式パネル体40Aが、第一レール10、もしくは主桁B1,もしくは主桁B1同士を繋ぐ横桁B2の少なくともいずれか一方に固定されている。【選択図】図3
ROAD BRIDGE INSPECTION DECK AND ROAD BRIDGE INSPECTION DECK CONSTRUCTION METHOD
To provide a permanent road bridge inspection deck having structural stability and a related road bridge inspection deck construction method.SOLUTION: A road bridge inspection deck 100 includes: a plurality of first rails 10, 10 supported by a plurality of bridge piers P1, P2 aligned in the bridge axial direction and attached to a plurality of main girders B1, B1 juxtaposed in a direction perpendicular to the bridge axial direction; and a first movable panel body 40 including a wheel unit 20 consisting of a plurality of wheels 21, 21 capable of traveling on the respective first rails 10, and a scaffold panel 30 supported by the wheel unit 20. Multiple scaffold panels 30 abut each other, and line the axial direction of a bridge below the main girder B1 to cutoff the main girder B1 from a lower space US. The first movable panel body 40A at the end of at least one of the bridge piers P2 is fixed to at least one of the first rails 10, the main girder B1, or a cross girder B2 connected to the main girder B1.SELECTED DRAWING: Figure 3
【課題】構造安定性のある常設の道路橋点検デッキと、係る道路橋点検デッキの施工方法を提供すること。【解決手段】橋軸方向に並ぶ複数の橋脚P1,P2で支持されるとともに、橋軸直角方向に併設される複数の主桁B1,B1に取り付けられている複数の第一レール10,10と、それぞれの第一レール10を走行自在な複数の車輪21,21からなる車輪ユニット20と、車輪ユニット20にて支持される足場パネル30と、を備える第一移動式パネル体40と、を有した道路橋点検デッキ100であり、複数の足場パネル30が相互に当接し、主桁B1の下方において橋軸方向に並んで主桁B1を下方空間USから遮断し、少なくとも一方の橋脚P2側端部にある第一移動式パネル体40Aが、第一レール10、もしくは主桁B1,もしくは主桁B1同士を繋ぐ横桁B2の少なくともいずれか一方に固定されている。【選択図】図3
ROAD BRIDGE INSPECTION DECK AND ROAD BRIDGE INSPECTION DECK CONSTRUCTION METHOD
道路橋点検デッキ及び道路橋点検デッキの施工方法
NORO TADAYUKI (author) / HAYASHI AKIO (author) / TAMAOKI MASAKAZU (author)
2019-03-28
Patent
Electronic Resource
Japanese