DESIGN SUPPORT DEVICE, DESIGN SUPPORT METHOD, AND PROGRAM
To reduce the time and effort in review of a foundation work accompanying the replacement of soil at a construction site.SOLUTION: A design support device according to an embodiment includes an acquisition unit configured to acquire design information including a depth from a first surface of a construction site to a lower end of a foundation supporting a structure and a depth of soil to be removed from the construction site from the first surface when the replacement of the soil designated by a user is implemented, a determination unit configured to determine foundations each having a depth from the first surface to the lower end of each foundation, shallower than the depth to a second surface of the construction site when the soil is removed from the first surface, and a display unit configured to display the foundations determined by the determination unit.SELECTED DRAWING: Figure 4
【課題】建設現場の土の入れ替えに伴う基礎工事の再検討の手間を軽減する。【解決手段】実施形態に係る設計支援装置は、建設現場の第1の地表から構造体を支持する基礎の下端までの深さを含む設計情報と、ユーザによって指定される土の入れ替えを行う際に建設現場から除去される土の第1の地表からの深さと、を取得する取得部と、第1の地表から基礎の下端までの深さが、第1の地表から土が除去されたときの建設現場の第2の地表までの深さよりも浅い基礎を特定する特定部と、特定部が特定した基礎を表示する表示部と、を備える。【選択図】図4
DESIGN SUPPORT DEVICE, DESIGN SUPPORT METHOD, AND PROGRAM
To reduce the time and effort in review of a foundation work accompanying the replacement of soil at a construction site.SOLUTION: A design support device according to an embodiment includes an acquisition unit configured to acquire design information including a depth from a first surface of a construction site to a lower end of a foundation supporting a structure and a depth of soil to be removed from the construction site from the first surface when the replacement of the soil designated by a user is implemented, a determination unit configured to determine foundations each having a depth from the first surface to the lower end of each foundation, shallower than the depth to a second surface of the construction site when the soil is removed from the first surface, and a display unit configured to display the foundations determined by the determination unit.SELECTED DRAWING: Figure 4
【課題】建設現場の土の入れ替えに伴う基礎工事の再検討の手間を軽減する。【解決手段】実施形態に係る設計支援装置は、建設現場の第1の地表から構造体を支持する基礎の下端までの深さを含む設計情報と、ユーザによって指定される土の入れ替えを行う際に建設現場から除去される土の第1の地表からの深さと、を取得する取得部と、第1の地表から基礎の下端までの深さが、第1の地表から土が除去されたときの建設現場の第2の地表までの深さよりも浅い基礎を特定する特定部と、特定部が特定した基礎を表示する表示部と、を備える。【選択図】図4
DESIGN SUPPORT DEVICE, DESIGN SUPPORT METHOD, AND PROGRAM
設計支援装置、設計支援方法、及びプログラム
INABA ATSUHIKO (author)
2019-04-04
Patent
Electronic Resource
Japanese
DESIGN SUPPORT DEVICE, DESIGN SUPPORT METHOD AND DESIGN SUPPORT PROGRAM
European Patent Office | 2024
|DESIGN SUPPORT DEVICE, DESIGN SUPPORT METHOD, AND DESIGN SUPPORT PROGRAM
European Patent Office | 2022
|DESIGN SUPPORT DEVICE, BUILDING, DESIGN SUPPORT METHOD, AND DESIGN SUPPORT PROGRAM
European Patent Office | 2023
|