To provide a civil engineering structure utilizing a bamboo reinforcing material with joints, which is treated with fumigation heat.SOLUTION: A reinforcing soil wall 1 being a civil engineering structure includes a retaining wall part 25 comprising multi-stepped embankment structures 3 constructed by heaping soil upon a bottom ground 2 sequentially. An L-shaped wall surface material 6 constituting a wall surface part 14 of the embankment structure 3, and a bamboo reinforcing material 11 having joints 29, at least one end of which is joined to the wall surface material 6 and which is treated with fumigation heat, are disposed on each of the upper surfaces of the bottom ground 2 and the multi-stepped embankment structure 3. The bamboo reinforcing materials 11 are arranged longitudinally from the front face toward the back face of the embankment structure 3, and laterally in multiple rows at regular intervals.SELECTED DRAWING: Figure 2
【課題】燻煙熱処理した節を有する竹補強材を利用した土木構造物を提供する。【解決手段】土木構造物である補強土壁1は、底面地盤2の上に順次盛土されて構築された複数段の盛土構造体3から成る擁壁部25を備えており、底面地盤2及び複数段の盛土構造体3は、それぞれその上面に、盛土構造体3の壁面部14を構成するL型の壁面材6と、壁面材6と少なくとも一端が連結された燻煙熱処理した節29を有する竹補強材11と、が配置されており、竹補強材11は、その長手方向が盛土構造体3の正面側から背面側に向かうように、かつ横方向に一定の間隔をおいて複数列配置されている。【選択図】図2
CIVIL ENGINEERING STRUCTURE
To provide a civil engineering structure utilizing a bamboo reinforcing material with joints, which is treated with fumigation heat.SOLUTION: A reinforcing soil wall 1 being a civil engineering structure includes a retaining wall part 25 comprising multi-stepped embankment structures 3 constructed by heaping soil upon a bottom ground 2 sequentially. An L-shaped wall surface material 6 constituting a wall surface part 14 of the embankment structure 3, and a bamboo reinforcing material 11 having joints 29, at least one end of which is joined to the wall surface material 6 and which is treated with fumigation heat, are disposed on each of the upper surfaces of the bottom ground 2 and the multi-stepped embankment structure 3. The bamboo reinforcing materials 11 are arranged longitudinally from the front face toward the back face of the embankment structure 3, and laterally in multiple rows at regular intervals.SELECTED DRAWING: Figure 2
【課題】燻煙熱処理した節を有する竹補強材を利用した土木構造物を提供する。【解決手段】土木構造物である補強土壁1は、底面地盤2の上に順次盛土されて構築された複数段の盛土構造体3から成る擁壁部25を備えており、底面地盤2及び複数段の盛土構造体3は、それぞれその上面に、盛土構造体3の壁面部14を構成するL型の壁面材6と、壁面材6と少なくとも一端が連結された燻煙熱処理した節29を有する竹補強材11と、が配置されており、竹補強材11は、その長手方向が盛土構造体3の正面側から背面側に向かうように、かつ横方向に一定の間隔をおいて複数列配置されている。【選択図】図2
CIVIL ENGINEERING STRUCTURE
土木構造物