A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR BALCONY AND BALCONY
To provide a construction method for a balcony and the balcony, which can configure various types of balconies, and realize reduction of material cost and simplification of management.SOLUTION: A balcony 10E is constituted by a floor frame part 11 and a plurality of deck members 12. In the floor frame part 11, all of prepared cover materials 20, a first corbel member 30 and a second corbel member 40 are incorporated as selectable materials. For the floor frame part 11, a front girder 13, gable beams 14 and beam materials 19 are assembled in a jamb, wherein the first corbel member 30 is attached to a side surface of the beam material 19, and the second corbel member 40 is attached to an outer wall surface 2B along a depth direction of a building skeleton and the first corbel member 30. On the second corbel member 40, the cover materials 20 are arranged over the deck members 12.SELECTED DRAWING: Figure 9
【課題】各種のバルコニーを構成することができ、部材コストの削減および管理の簡略化を図ることができるバルコニーの施工方法およびバルコニーを提供すること。【解決手段】バルコニー10Eは、床組部11と、複数のデッキ材12とによって構成される。床組部11には、用意したカバー材20、第一持出し材30および第二持出し材40のうちのすべてが選択部材として組み込まれている。床組部11では、前桁13、妻梁14および梁材19を三方枠組みしており、梁材19の側面には、第一持出し材30が取り付けられており、第二持出し材40は、建物躯体の奥行方向に沿った外壁面2Bおよび第一持出し材30に取り付けられている。第二持出し材40には、カバー材20がデッキ材12までにわたって配置されている。【選択図】図9
CONSTRUCTION METHOD FOR BALCONY AND BALCONY
To provide a construction method for a balcony and the balcony, which can configure various types of balconies, and realize reduction of material cost and simplification of management.SOLUTION: A balcony 10E is constituted by a floor frame part 11 and a plurality of deck members 12. In the floor frame part 11, all of prepared cover materials 20, a first corbel member 30 and a second corbel member 40 are incorporated as selectable materials. For the floor frame part 11, a front girder 13, gable beams 14 and beam materials 19 are assembled in a jamb, wherein the first corbel member 30 is attached to a side surface of the beam material 19, and the second corbel member 40 is attached to an outer wall surface 2B along a depth direction of a building skeleton and the first corbel member 30. On the second corbel member 40, the cover materials 20 are arranged over the deck members 12.SELECTED DRAWING: Figure 9
【課題】各種のバルコニーを構成することができ、部材コストの削減および管理の簡略化を図ることができるバルコニーの施工方法およびバルコニーを提供すること。【解決手段】バルコニー10Eは、床組部11と、複数のデッキ材12とによって構成される。床組部11には、用意したカバー材20、第一持出し材30および第二持出し材40のうちのすべてが選択部材として組み込まれている。床組部11では、前桁13、妻梁14および梁材19を三方枠組みしており、梁材19の側面には、第一持出し材30が取り付けられており、第二持出し材40は、建物躯体の奥行方向に沿った外壁面2Bおよび第一持出し材30に取り付けられている。第二持出し材40には、カバー材20がデッキ材12までにわたって配置されている。【選択図】図9
CONSTRUCTION METHOD FOR BALCONY AND BALCONY
バルコニーの施工方法およびバルコニー
YASUI HIDEAKI (author) / WATANABE RYUJI (author)
2019-04-25
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
BALCONY CONSTRUCTION STRUCTURE AND BALCONY CONSTRUCTION METHOD
European Patent Office | 2024
|Balcony supporting frame and balcony construction system
European Patent Office | 2023
|BALCONY RAILINGS CONSTRUCTION METHOD AND BALCONY RAILINGS
European Patent Office | 2019
|PROMINENT BALCONY AND CONSTRUCTION METHOD FOR PROMENENT BALCONY
European Patent Office | 2016
|