A platform for research: civil engineering, architecture and urbanism
To provide a skeleton structure of a cultivation greenhouse which is proof against heavy rain and heavy snow, and may be established for a dramatically reduced establishment time by removing cutting and bending operation.SOLUTION: There is provided a skeleton structure of a cultivation greenhouse comprising: first and second straight framework units U1, U2 having an outer framework surface facing to a cover and an inner framework surface facing to inner section of the cultivation greenhouse; and a main connection port 300 connecting the first and second framework units U1,U2 in a bending state. The main connection port 300 comprises: a connection plate 310 having a first edge facing to the outer framework surface longer than a second edge facing to the inner framework surface; a first fastening bolt 320 fastening one end part of the connection plate 310 and the first framework unit U1; a second fastening bolt 330 fastening the other end part of the connection plate 310 and the second framework unit U2; and a reinforcement part whose center part has a projecting shape rather than an edge part at a site from one end to the other end of the connection plate 310.SELECTED DRAWING: Figure 3
【課題】集中豪雨や大雪などにも耐えることができるし、切断及びベンディング作業を除去して設置期間を相当に縮めさせることができる栽培ハウスの骨組構造物を提供する。【解決手段】覆いに向ける骨組外面と栽培ハウスの内部に向ける骨組内面を含む直線形態の第1及び第2単位骨組U1,U2と、及び第1及び第2単位骨組U1,U2を連結するが、ベンディングされた形態で連結するメイン連結口300と、を含んで、メイン連結口300は、骨組外面を向ける第1縁が骨組内面を向ける第2縁に比べて長い形状を有する連結板310と、連結板310の一端部と第1単位骨組U1を締結させる第1締結ボルト320と、連結板310の他端部と第2単位骨組U2を締結させる第2締結ボルト330と、及び連結板310の一端から他端までにかけてその中心部分がその縁部分に比べて突き出された形状を有する補強部と、を含む栽培ハウスの骨組構造物。【選択図】図3
To provide a skeleton structure of a cultivation greenhouse which is proof against heavy rain and heavy snow, and may be established for a dramatically reduced establishment time by removing cutting and bending operation.SOLUTION: There is provided a skeleton structure of a cultivation greenhouse comprising: first and second straight framework units U1, U2 having an outer framework surface facing to a cover and an inner framework surface facing to inner section of the cultivation greenhouse; and a main connection port 300 connecting the first and second framework units U1,U2 in a bending state. The main connection port 300 comprises: a connection plate 310 having a first edge facing to the outer framework surface longer than a second edge facing to the inner framework surface; a first fastening bolt 320 fastening one end part of the connection plate 310 and the first framework unit U1; a second fastening bolt 330 fastening the other end part of the connection plate 310 and the second framework unit U2; and a reinforcement part whose center part has a projecting shape rather than an edge part at a site from one end to the other end of the connection plate 310.SELECTED DRAWING: Figure 3
【課題】集中豪雨や大雪などにも耐えることができるし、切断及びベンディング作業を除去して設置期間を相当に縮めさせることができる栽培ハウスの骨組構造物を提供する。【解決手段】覆いに向ける骨組外面と栽培ハウスの内部に向ける骨組内面を含む直線形態の第1及び第2単位骨組U1,U2と、及び第1及び第2単位骨組U1,U2を連結するが、ベンディングされた形態で連結するメイン連結口300と、を含んで、メイン連結口300は、骨組外面を向ける第1縁が骨組内面を向ける第2縁に比べて長い形状を有する連結板310と、連結板310の一端部と第1単位骨組U1を締結させる第1締結ボルト320と、連結板310の他端部と第2単位骨組U2を締結させる第2締結ボルト330と、及び連結板310の一端から他端までにかけてその中心部分がその縁部分に比べて突き出された形状を有する補強部と、を含む栽培ハウスの骨組構造物。【選択図】図3
SKELETON STRUCTURE OF CULTIVATION GREENHOUSE
栽培ハウスの骨組構造物
KIM JI-TE (author)
2019-06-13
Patent
Electronic Resource
Japanese
Celery summer out-of-season cultivation greenhouse and cultivation method using greenhouse
European Patent Office | 2023
|Achieving sustainable greenhouse cultivation
TIBKAT | 2019
|