A platform for research: civil engineering, architecture and urbanism
FORMWORK UNIT AND CONSTRUCTION METHOD OF CONCRETE STRUCTURE USING THE FORMWORK UNIT
To reduce construction period by facilitating installation.SOLUTION: A formwork unit comprises a plurality of support posts 20 having vertical posts 21 extending vertically, mating portions 25 extending vertically in the side portion of the vertical posts 21, and horizontal posts 22 extending horizontally from the lower end of the vertical posts 21 to allow the vertical posts 21 to stand alone, and a sheathing board 50 having a fitting portion 51 extending in the vertical direction at the side end portion, and being held between a plurality of support posts 20 by fitting the fitting portion 51 into the mating portion 25 and on which the concrete is cast on the back side.SELECTED DRAWING: Figure 1
【課題】設置を容易にすることにより工期の短縮化を図る。【解決手段】上下方向に延びる縦柱部21、縦柱部21の側部に上下方向に延設された被嵌合部25及び、縦柱部21の下端から水平方向に延設されて縦柱部21を自立可能にする横柱部22を有する複数の支柱20と、側端部に上下方向に延設された嵌合部51を有すると共に、嵌合部51を被嵌合部25に嵌め込むことにより複数の支柱20間に保持され、その背面側にコンクリートが打設される堰板50とを備えた。【選択図】図1
FORMWORK UNIT AND CONSTRUCTION METHOD OF CONCRETE STRUCTURE USING THE FORMWORK UNIT
To reduce construction period by facilitating installation.SOLUTION: A formwork unit comprises a plurality of support posts 20 having vertical posts 21 extending vertically, mating portions 25 extending vertically in the side portion of the vertical posts 21, and horizontal posts 22 extending horizontally from the lower end of the vertical posts 21 to allow the vertical posts 21 to stand alone, and a sheathing board 50 having a fitting portion 51 extending in the vertical direction at the side end portion, and being held between a plurality of support posts 20 by fitting the fitting portion 51 into the mating portion 25 and on which the concrete is cast on the back side.SELECTED DRAWING: Figure 1
【課題】設置を容易にすることにより工期の短縮化を図る。【解決手段】上下方向に延びる縦柱部21、縦柱部21の側部に上下方向に延設された被嵌合部25及び、縦柱部21の下端から水平方向に延設されて縦柱部21を自立可能にする横柱部22を有する複数の支柱20と、側端部に上下方向に延設された嵌合部51を有すると共に、嵌合部51を被嵌合部25に嵌め込むことにより複数の支柱20間に保持され、その背面側にコンクリートが打設される堰板50とを備えた。【選択図】図1
FORMWORK UNIT AND CONSTRUCTION METHOD OF CONCRETE STRUCTURE USING THE FORMWORK UNIT
型枠ユニット及び、型枠ユニットを用いたコンクリート構造物の構築方法
FUJIWARA SOICHI (author) / MIYAIRI HITOSHI (author)
2019-06-13
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
FORMWORK UNIT AND CONSTRUCTION METHOD OF CONCRETE STRUCTURE USING THE FORMWORK UNIT
European Patent Office | 2019
|Formwork, formwork unit and construction method for building convex joint construction
European Patent Office | 2024
|